17
|
Unit installation
Installer and user reference guide
63
RXYSQ4~6T8V/YB
VRV IV-S system air conditioner
4P482277-1B – 2020.10
17.3 Mounting the outdoor unit
17.3.1 About mounting the outdoor unit
Typical workflow
Mounting the outdoor unit typically consists of the following stages:
1
Providing the installation structure.
2
Installing the outdoor unit.
3
Providing drainage.
4
Preventing the unit from falling over.
17.3.2 Precautions when mounting the outdoor unit
INFORMATION
Also read the precautions and requirements in the following chapters:
▪
General safety precautions
▪
Preparation
17.3.3 To provide the installation structure
Check the strength and level of the installation ground so that the unit will not
cause any operating vibration or noise.
Fix the unit securely by means of foundation bolts in accordance with the
foundation drawing.
Prepare 4 sets of anchor bolts, nuts and washers (field supply) as follows:
(mm)
>150
620
350
(345-355)
4× M12
a
a
Make sure not to cover the drain holes.
INFORMATION
The recommended height of the upper protruding part of the bolts is 20 mm.
20
Содержание VRV IV-S RXYSQ4T8VB Series
Страница 135: ......
Страница 136: ...4P482277 1B 2020 10 Copyright 2017 Daikin Verantwortung für Energie und Umwelt ...