14
|
About the box
Installer and user reference guide
49
R R8T7V1B
VRV IV heat pump for indoor installation
4P499898-1A – 2020.10
14 About the box
In this chapter
14.1 About LOOP BY DAIKIN
is part of Daikin's wider commitment to reduce our environmental footprint.
With
we want to create a circular economy for refrigerants. One of the actions
to achieve this, is the reuse of reclaimed refrigerant in VRV units produced and sold
in Europe. For more information about the countries that are in scope, visit:
14.2 Overview: About the box
This chapter describes what you have to do after the boxes with the compressor
unit and the heat exchanger unit are delivered on-site.
▪
Removing the transportation stay (only for RKXYQ5)
▪
Removing the transportation EPS (only for RKXYQ8)
▪
Removing the transportation sheet from the heat exchanger unit
Keep the following in mind:
▪
At delivery, the unit MUST be checked for damage. Any damage MUST be
reported immediately to the claims agent of the carrier.
▪
Bring the packed unit as close as possible to its final installation position to
prevent damage during transport.
▪
Prepare the path along which you want to bring the unit inside in advance.
▪
When handling the unit, take into account the following:
Fragile, handle the unit with care.
Keep the unit upright in order to avoid compressor damage.
Содержание VRV IV RKXYQ5T8Y1B Series
Страница 155: ......
Страница 156: ...4P499898 1A 2020 10 Copyright 2017 Daikin Verantwortung f r Energie und Umwelt...