4

If the calculated amount of pre-charging is reached, close
valve B.

5

After pre-charging, perform the refrigerant charge operation as
shown below and charge the remaining refrigerant of the
additional charging amount through valve A. 

(See figure 24)

1.

Start of automatic charging refrigerant
-

Open the liquid pipe, suction gas pipe, high pressure/low 
pressure gas pipe and equalizer pipe stop valves and the 
service port stop valve. (Valves A, B and C must be closed.)

-

Close all front panels except the electric box front panel and 
turn the power ON.

-

Make sure all indoor units are connected, refer to 

"11.4. How 

to check how many units are connected" on page 18

.

-

If the H2P LED is not flashing (in 12 minutes time after 
turning on the power), make sure it is displayed as shown in 
the 

"2 Normal system display" on page 22

.

If the H2P LED is flashing, check the malfunction code on the
remote controller

 

"3 Remote controller malfunction code

display" on page 22

.

2.

Press the 

 button once if the LEDs combination is not

as in the figure below.

3.

Press the 

 button once.

4.

Hold the 

 button down for 5 seconds or more.

5.

Charging mode judgement
However, if the indoor temperature is 10°C DB or lower, in some
cases the unit will charge in heating mode to increase the indoor
temperature. 
The unit will automatically select the cooling mode or heating
mode for charging.

Charging in heating mode 

6.

Start up
Wait while the unit is preparing for charging in heating mode.

It takes about 2 to 10 minutes for the system to become stable.
In case of a small charging amount, the system will star t charging
the refrigerant before the system reaches the stable state. It may
disturb a correct decision and may cause overcharging.

7.

Ready

Press the 

 button once within 5 minutes. 

If the 

 button is not pushed within 5 minutes, 

P2

 will be

displayed on the remote controller. Refer to 

"3 Remote controller

malfunction code display" on page 22

.

8.

Operation
When the following LED display is shown, open valve A and
close the front panel. If the front panel is left open, the system
can not operate properly during the refrigerant charging.

1

Measuring instrument

2

Refrigerant tank (R410A, siphon system)

3

Charge hose

4

Equalizer pipe stop valve

5

High pressure/low pressure gas pipe stop valve

6

Suction gas pipe stop valve

7

Liquid pipe stop valve

8

Refrigerant charge port

9

Valve A

10

Valve B

11

Valve C

12

To BS unit, indoor unit

13

Stop valve

14

Service port

15

Field piping

16

Refrigerant flow when pre-charging through the liquid stop valve 
service port (refer to step 

3 on page 19

)

17

Refrigerant flow when automatic charging through the charge port 
(refer to step 

5 on page 20

)

18

The refrigerant will be charged with ±30 kg in 1 hour at an outdoor 
temperature of 30°C DB (12 kg at 0°C DB). If you need to speed 
up in case of a multi system, connect the refrigerant tank to each 
outdoor unit.

At least the unit should be charged with its original amount
of refrigerant (refer to the nameplate on the unit), before
starting the automatic charging.

NOTE

When the leak detection function is not required,
complete charging when using the previous described
method (unit is not operating) can be done.

If it is not possible to charge the entire quantity through
the service port of the liquid pipe stop valve with the
unit not operating, refer to 

"14. Additional  refrigerant

charging method" on page 27

.

NOTE

For a multi outdoor unit system, it is not required
to connect all charge ports to a refrigerant tank.

The refrigerant will be charged with ±30 kg in
1 hour time at an outdoor temperature of 30°C DB
or with ±12 kg at an outdoor temperature of
0°C DB.

If you need to speed up in case of a multiple
outdoor system, connect the refrigerant tanks to
each outdoor unit as shown in 

figure 24

.

If you perform the refrigerant charging operation
within the refrigerant system with one or more
units with power OFF, the refrigerant charging
operation can not be accomplished properly.
For confirming the number of outdoor units and
indoor units with power ON, refer to 

"11.4. How to

check how many units are connected" on
page 18

.

In case of a multi system, turn the power ON to
all outdoor units in the refrigerant system.

To  energize the crankcase heater, make sure to
turn the power ON at least 6 

hours before

starting operation.

H1P

H2P

H3P

H4P

H5P

H6P

H7P

x

x w x

x

x

x

H1P

H2P

H3P

H4P

H5P

H6P

H7P

w w w w w w w

When charging in cooling mode, the unit will stop
operating when the required amount of
refrigerant is charged.

During charging in heating mode, a person must
manually close valve A before complete charging
is finished. The required amount is the calculated
amount (see 

"6.6. Example of connection" on

page 9

), therefore, the weight must be monitored

constantly.

H1P

H2P

H3P

H4P

H5P

H6P

H7P

Pressure control 
(for the first minute)

x c x

x

x

x w

Start up control 
(for the next 2 minutes)

c c x

x

x w x

Waiting for stable 
heating conditions 
(for the next ±15 
minutes (according to 
the system))

c c x

x

x w w

H1P

H2P

H3P

H4P

H5P

H6P

H7P

c c x

x w x w

BS1  MODE

BS4  TEST

BS4  TEST

BS4  TEST

BS4  TEST

Содержание VRV III

Страница 1: ...INSTALLATION MANUAL REMQ8P9Y1B REMQ10P8Y1B REM H Q12P8Y1B REMQ14P8Y1B REMQ16P8Y1B System air conditioner ...

Страница 2: ... mm d 500 mm a 50 mm b 100 mm c 50 mm d 500 mm a 200 mm b 300 mm a 10 mm b 300 mm c 10 mm d 500 mm e 20 mm a 50 mm b 100 mm c 50 mm d 500 mm e 100 mm a 200 mm b 300 mm e 400 mm a 10 mm b 300 mm c 10 mm d 500 mm e 20 mm f 600 mm a 50 mm b 100 mm c 50 mm d 500 mm e 100 mm f 500 mm a 10 mm b 300 mm c 10 mm d 300 mm e 20 mm f 500 mm a 50 mm b 100 mm c 50 mm d 100 mm e 100 mm f 500 mm 1500 500 11 2 1 6...

Страница 3: ...m 500 mm 1 1 1 A B 2 2 2 4 5 3 8 F1 F2 F1 F2 Q1 Q2 F1 F1 F2 F2 Q1Q2 7 TOIN DUNIT TOOUT DUNIT TOMULTIUNIT A1P Q1 Q2 A1P Q1 Q2 A1P 1 2 2 3 4 5 6 8 10 10 9 9 REMQ8 12 REMQ14 16 REMHQ12 1 2 3 4 1 5 6 7 8 F1 F2F1F2 F1 F2F1F2 TO IN D UNIT TO OUT D UNIT TO IN D UNIT TO OUT D UNIT F1 F2 F1 F2 F1 F2 F1 F2 F1 F2 F1 F2 11 10 10 9 9 12 13 14 15 16 17 18 20 19 21 ...

Страница 4: ...entom ima uz uvjet da se oni koriste u skladu s našim uputama 16 megfelelnek az alábbi szabvány ok nak vagy egyéb irányadó dokumentum ok nak ha azokat előírás szerint használják 17 spełniają wymogi następujących norm i innych dokumentów normalizacyjnych pod warunkiem że używane są zgodnie z naszymi instrukcjami 18 sunt în conformitate cu următorul următoarele standard e sau alt e document e normat...

Страница 5: ...in matalapainepuolen lämpötila L C TSmax Suurinta sallittua painetta PS vastaava kyllästyslämpötila M C Kylmäaine N Varmuuspainelaitteen asetus P bar Valmistusnumero ja valmistusvuosi katso mallin nimikilpi 14 Maximální přípustný tlak PS K bar Minimální maximální přípustná teplota TS TSmin Minimální teplota na nízkotlaké straně L C TSmax Saturovaná teplota odpovídající maximálnímu přípustnému tlak...

Страница 6: ... 75 kW For changing the refrigerant flow to indoor units the REYQ P system can be combined with BS units of the types BSVQ100P BSVQ160P and BSVQ250P only Other BS unit types will cause malfunctions when combined with the REYQ P system The REM H Q P units can be combined with Daikin VRV indoor units for air conditioning purposes suitable for R410A The present installation manual describes the proce...

Страница 7: ... REYQ48 REMQ16 REMQ16 REMQ16 600 1560 Standard combinations of outdoor units Total capacity of indoor units REYHQ16 REMQ8 REMQ8 200 520 REYHQ20 REMQ8 REMHQ12 250 650 REYHQ22 REMQ10 REMHQ12 275 715 REYHQ24 REMHQ12 REMHQ12 300 780 NOTE When installing a multi outdoor system with 2 units BHFQ23P907 outdoor unit multi connection piping kit is required with 3 units BHFQ23P1357 outdoor unit multi connec...

Страница 8: ...lowable safety limits in the event of a refrigerant leak 11 To prevent dripping water to form a puddle underneath the unit install a drain pan available as option kit 12 The equipment is not intended for use in a potentially explosive atmosphere Make sure to provide for adequate measures in order to prevent that the outdoor unit be used as a shelter by small animals Small animals making contact wi...

Страница 9: ...e The height of the foundation must at least be 150 mm from the floor The unit must be installed on a solid longitudinal foundation steelbeam frame or concrete and make sure the base under the unit is larger than the grey marked area as indicated in figure 3 Fasten the unit in place using four foundation bolts M12 It is best to screw in the foundation bolts until their length remains 20 mm above t...

Страница 10: ...iping must be installed by a licensed refrigeration technician and must comply with relevant local and national regulations Caution to be taken when brazing refrigerant piping Do not use flux when brazing copper to copper refrigerant piping Particularly for the HFC refrigerant piping Therefore use the phosphor copper brazing filler metal BCuP which does not require flux Flux has extremely harmful ...

Страница 11: ...alves are fully closed 2 Connect a charge hose to service ports of all stop valves 3 Recover gas and oil from the pinched piping by using a recovery unit 4 When all gas and oil is recovered from the pinched piping disconnect the charge hose and close the service ports 5 In case the pinched piping lower parts looks like detail A in figure 6 proceed with procedure step 8 In case the pinched piping l...

Страница 12: ...ons The piping between the outdoor units must be routed level or slightly upward to avoid the risk of oil retention into the piping side Pattern 1 Pattern 2 Prohibited patterns change to pattern 1 or 2 To avoid the risk of oil retention to the outmost outdoor unit always connect the stop valve and the piping between outdoor units as shown in the 4 correct possibilities of the figure below NOTE All...

Страница 13: ...lation may lead to malfunction of the outdoor unit 5 Piping length restrictions Make sure to perform the piping installation within the range of the maximum allowable pipe length allowable level difference and allowable length after branching as indicated in 6 6 Example of connection on page 9 6 5 Protection against contamination when installing pipes Take measures to prevent foreign materials lik...

Страница 14: ... 40 m Outdoor unit multi connection piping kit and refrigerant branch kit selection How to select the refnet joint When using refnet joints at the first branch counted from the outdoor unit side choose from the following table in accordance with the capacity of the outdoor unit example refnet joint A How to select the refnet header Choose from the following table in accordance with the total capac...

Страница 15: ...cted outdoor unit Suction gas pipe Liquid pipe 20 25 32 40 50 12 7 6 4 Outdoor unit capacity type Hp Piping outer diameter size mm 63 80 100 125 15 9 9 5 Suction gas pipe HP LP gas pipe Liquid pipe 200 19 1 9 5 8 10 22 2 19 1 9 5 250 22 2 9 5 12 28 6 19 1 12 7 14 16 28 6 22 2 12 7 D Equalizer piping outdoor units only Piping outer diameter size mm 19 1 How to calculate the additional refrigerant t...

Страница 16: ...to 90 m Size up of the main suction gas pipe may affect a good oil return to the outdoor unit due to influence of the HP LP gas pipe indoor unit 8 b c d e f g p 90 m increase the pipe size of b c d e f g Increase the pipe size as follows For calculation of total extension length the actual length of above pipes must be doubled except length of main pipes and of pipes which do not have an increased...

Страница 17: ... fan PS Switching power supply A1P A3P Q1DI Earth leakage breaker field supply Q1RP Phase reversal detection circuit R1T Thermistor air A1P fin A3P R3T R9T Thermistor H E gas H E de icer sub cool H E gas sub cool H E liquid H E liquid suction liquid R10 Resistor current sensor A4P A8P R31T R33T Thermistor discharge M1C M3C R50 R59 Resistor R90 Resistor current sensor R95 Resistor current limiting ...

Страница 18: ... for connection wiring to indoor outdoor transmission F1 F2 outdoor outdoor transmission F1 F2 outdoor multi transmission Q1 Q2 and on how to use BS1 BS5 and DS1 DS2 switch Do not operate the unit by short circuiting protection device S1PH S3PH NOTE Use copper conductors only For connection wiring to the central remote controller refer to the installation manual of the central remote controller Us...

Страница 19: ...ans that an earth leakage breaker capable of handling high frequency electrical noise must be used in order to prevent malfunctioning of the earth leakage breaker itself Earth leakage breakers that are especially designed for protecting ground faults must be used in conjunction with main switch and fuse for use with wiring Never connect the power supply in reversed phase The unit can not operate n...

Страница 20: ...the back of the electric box lid 2 Power wiring and ground wiring between outdoor units inside conduit When the wiring is routed out through the lateral panel 3 Transmission wiring 4 Pipe opening 5 Conduit 6 Power wiring and ground wiring 7 Cut off the shaded zones before use 8 Through hole cover 1 Knockout hole 2 Burr 3 If there are any possibilities that small animals enter the system through th...

Страница 21: ...ansmission wiring between outdoor units 1 Liquid pipe 2 HP LP gas pipe 3 Finishing tape 4 Suction gas pipe 5 Transmission wiring 6 Insulation material 1 Power supply 380 415 V 3N 50 Hz 2 Earth leakage breaker 3 Fuse 4 Grounding wire 5 Power supply terminal block 6 Connect each power wire RED to L1 WHT to L2 BLK to L3 and BLU to N 7 Ground wire GRN YLW 8 Clamp the power wire to the plastic bracket ...

Страница 22: ...rigerant follow the procedure as described in this chapter 11 1 Important information regarding the refrigerant used This product contains fluorinated greenhouse gases covered by the Kyoto Protocol Do not vent gases into the atmosphere Refrigerant type R410A GWP 1 value 1975 1 GWP global warming potential Please fill in with indelible ink the factory refrigerant charge of the product the additiona...

Страница 23: ...at are active can be read from the LED display in the Monitor Mode procedure below NOTE National implementation of EU regulation on certain fluorinated greenhouse gases may require to provide the appropriate official national language on the unit Therefore an additional multilingual fluorinated greenhouse gases label is supplied with the unit Sticking instructions are illustrated on the backside o...

Страница 24: ... button to return to step 1 setting mode 1 H1P x OFF Adding refrigerant using the automatic refrigerant charging function is recommended When charging a system charging over the permissible quantity can cause liquid hammer Always use protective gloves and protect your eyes when charging refrigerant When the refrigerant charging procedure is done or when pausing close the valve of the refrigerant t...

Страница 25: ...o BS unit indoor unit 13 Stop valve 14 Service port 15 Field piping 16 Refrigerant flow when pre charging through the liquid stop valve service port refer to step 3 on page 19 17 Refrigerant flow when automatic charging through the charge port refer to step 5 on page 20 18 The refrigerant will be charged with 30 kg in 1 hour at an outdoor temperature of 30 C DB 12 kg at 0 C DB If you need to speed...

Страница 26: ... to confirm that charging is completed Record the amount that was added on the additional refrigerant charge label provided with the unit and attach it on the back side of the front panel Perform the procedure 11 6 Procedure for inputting the additional refrigerant charge weight into the PCB as described on page 22 10 In case leak detection function not required Press the button once and the charg...

Страница 27: ...g c x x w x x x x w Slave unit 1 a c x x x x x x x c Slave unit 2 a c x x x x x x x x Error code P8 recharge operation Close valve A immediately and press the TEST OPERATION button once The operation will restart from the charging mode judgement onwards P2 charge hold Close valve A immediately Check following items Check if the gas side stop valve is opened correctly Check if the valve of the refr...

Страница 28: ...procedure from step 2 onwards Make sure to open the stop valves after charging the refrigerant Operating with the stop valves closed will damage the compressor BS1 MODE BS1 MODE WARNING ELECTRIC SHOCK Caution when performing service to inverter equipment 1 Do not open the electric box cover for 10 minutes after the power supply is turned off 2 Measure the voltage between terminals on the terminal ...

Страница 29: ...itch which is located on the outdoor unit PCB A1P The figure shows state of the LED indications when the unit is shipped from the factory Check operation procedure 1 Turn the power on for the outdoor unit and the indoor unit Be sure to turn the power on at least 6 hours before operation in order to have power running to the crankcase heater 2 Make sure that transmission is normal by checking the L...

Страница 30: ...n state x normal w abnormal c under preparation or under test operation 2 Indication of low noise operation state x standard operation factory setting w operation 3 Indication of power consumption limitation setting x standard operation factory setting w operation NOTE If you get confused in the middle of the setting process push the button Then it returns to setting mode 1 H1P LED is off Possible...

Страница 31: ...tarts During the test operation the refrigerant running sound or the magnetic sound of a solenoid valve may become loud and the LED display may change but these are not mal functions During the test operation it is not possible to stop the unit operation from a remote controller To abort the operation press the button The unit will stop after 30 seconds 6 Close the front panel in order to let it n...

Страница 32: ...igerant charge hose to the refrigerant charging port for additionaly charging 4 When the unit is not operating push the button until the additional refrigerant charging operation function A in setting mode 2 can be defined refer to Setting the mode on page 25 the H1P LED is on w 5 The operation starts automatically The H2P LED will start flashing c and the messages Test operation and Under central...

Страница 33: ... heavier than air Procedure for checking maximum concentration Check the maximum concentration level in accordance with steps 1 to 4 below and take whatever action is necessary to comply 1 Calculate the amount of refrigerant kg charged to each system separately 2 Calculate the smallest room volume m3 In a case such as the following calculate the volume of A B as a single room or as the smallest ro...

Страница 34: ...6P8 REMHQ12P8Y1B VRVIII System air conditioner 4PW48463 1A 16 DISPOSAL REQUIREMENTS Dismantling of the unit treatment of the refrigerant of oil and of other parts must be done in accordance with relevant local and national legislation NOTES ...

Страница 35: ... 3 2 6 6 6 6 23 18 9 8 1 2 4 3 5 13 14 15 10 7 12 19 2 1 24 6 11 16 17 15 6 5 10 11 12 7 4 9 16 17 18 3 8 13 14 2 2 1 1 9 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 4 4 6 6 6 6 6 6 NOTES 22 23 24 ...

Страница 36: ...4PW48463 1A Copyright Daikin ...

Отзывы: