6 .4 . Installing the unit
Make sure the unit is installed level on a sufficiently strong base to
prevent vibration and noise.
NOTE
When the installation height of the unit needs to be increased, do not
use stands to only support the corners.
A
A
A
A
A
A
A
≥
3-7/8 in. (100 mm)
X Not allowed
O Allowed
•
The height of the foundation must be at least 5-7/8 in. (150 mm )
from the floor.
In heavy snowfall areas, this height should be increased, depending
on the installation place and condition.
•
The unit must be installed on a solid longitudinal foundation (steel
beam frame or concrete) and make sure the base under the unit is
larger than the gray marked area.
3
4
2
5
6
7
1
Dimensions for above figure
1 Hole for foundation bolt
f
9/16 in. (15 mm) dia: 4 positions
2
2 Inner dimension of
the base
≤
24-7/8 in. (631 mm)
3
Distance between
foundation bolt holes
29 in. (729 mm)
4 Width of unit
30-3/16 in. (767 mm)
5
Outer dimension of the
base
≥
30-3/16 in. (767 mm)
6
Longitudinal foundation
dimension
48-7/8 in. (1242 mm)
7
Distance between
foundation bolt holes
42-3/8 in. (1076 mm)
•
Fasten the unit in place using 4 foundation bolts
7/16 in. (M12). It is best to screw in the founda-
tion bolts until their length remains 13/16 in. (20
mm) above the foundation surface.
A
A=13/16 in. (20 mm)
NOTE
•
There are restrictions on the refrigerant pipe connecting order
between outdoor units in the case of the multi system.
See 1.2.2. Outdoor units combinations on page 2 for detail.
• When installing on a roof, make sure the roof floor is strong enough
and be sure to waterproof all work.
•
Make sure the area around the machine drains properly by setting
up drainage grooves around the foundation.
•
Drain water is sometimes discharged from the outdoor unit when it
is running.
•
For anti-corrosion type, use nuts with resin washers. If the paint on
nut connections comes off, the anti-corrosion effect may decrease.
Resin washer
6 .5 . Method for removing shipping plates
The shipping plates installed over the compressor legs for protecting
the unit during transport must be removed. Proceed as shown in the
figure and procedure below. RXLQ72T does not have the shipping
plates.
Shipping plates
Front
RXLQ96-120T type
1
Remove bolts (2 pcs.) for fixing shipping plate.
2
Remove all shipping plates (3 pcs.).
3
Be sure to tighten the removed bolts back again.
Shipping plate 3
Shipping plate 1
Shipping plate 2
Bolt
NOTE
If the unit is operated with the shipping plates still attached, abnormal
vibration or noise may be generated.
01_EN_3P477778-3C.indb 8
2/8/2018 14:31:14
Содержание VRV Aurora RXLQ120TATJU
Страница 49: ...3P477778 3C EM17A024 1801 HT...