Translation from original instructions
Installation manual
38
We reserve the right to make changes without any prior notice.
UATYQ*Y1
Packaged Rooftop
4P522680-1
7.3 Internal cleaning
It is essential to keep the installation site clean and tidy for correct maintenance of the unit and to keep it in good
working order.
7.3.1 Cleaning the unit
Keep the inside of the electrical control panel and the compressor compartment clean.
After working on the unit, always clean the electrical control panel of any work remnants and extraneous components.
Restore the safety devices and protective devices that had to be removed in order to carry out the work.
Use a vacuum cleaner to eliminate small objects, work remnants and/or any dust.
Do not use compressed air
If you have to carry out work on compressors inside the compartment, before closing it again, check that the electrical
box of the compressor is closed correctly and that any refrigerant circuit valves are in the correct state, and make sure
you do not leave any materials inside the compartment.
Содержание UATYQ-AFC3Y1
Страница 2: ......
Страница 42: ......
Страница 43: ......
Страница 44: ...Copyright 2018 Daikin 4P522680 1 2018 03 UM_DKN_0001_Rooftop_EN_12 09 2018_rev02...