SiBE041010
Outdoor Unit
Removal Procedure
125
2.3
Removal of Electrical Box / Control PCB
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Remove the right side
panel.
Preparation
Remove the panels
according to the “Removal of
Panels”.
1
Remove the screw on
the rear side of the right
side panel.
2
Release the outdoor
temperature thermistor.
The outdoor temperature
thermistor is hooked on the
guard net.
3
Lift up the guard net to
remove.
4
Remove the 4 screws
on the right side panel.
(R12019)
Right
side
panel
(R12006)
Outdoor temperature thermistor
(R7384)
Guard net
(R10716)