19
|
Configuration
Installer and user reference guide
121
RYYQ+RYMQ+RXYQ
VRV IV+ heat pump
4P546228-1C – 2021.11
19 Configuration
In this chapter
Energy saving and optimum operation.................................................................................................................................. 136
19.3.1
19.1 Overview: Configuration
This chapter describes what you have to do and know to configure the system after
it is installed.
It contains information about:
▪
Making field settings
▪
Energy saving and optimum operation
▪
Using the leak detection function
INFORMATION
It is important that all information in this chapter is read sequentially by the installer
and that the system is configured as applicable.
DANGER: RISK OF ELECTROCUTION
19.2 Making field settings
19.2.1 About making field settings
To continue the configuration of the VRV IV heat pump system, it is required to
give some input to the PCB of the unit. This chapter will describe how manual input
is possible by operating the push buttons/DIP switches on the PCB and reading the
feedback from the 7‑segment displays.
Making settings is done via the master outdoor unit.
Next to making field settings it is also possible to confirm the current operation
parameters of the unit.
Содержание RYYQ8U7Y1B
Страница 174: ......
Страница 175: ......
Страница 176: ...4P546228 1C 2021 11 Copyright 2018 Daikin Verantwortung f r Energie und Umwelt...