5 Installation
Installation and operation manual
8
RXYTQ8~16T7YF
VRV IV system air conditioner
4P388987-1C – 2016.02
2×
8 HP
SW8
6×
10~16 HP
SW8
NOTICE
When closing the electrical component box cover, make
sure that the sealing material on the lower back side of the
cover is not caught and bend towards the inside.
a
b
c
d
e
a
Electrical component box cover
b
Front side
c
Power supply terminal block
d
Sealing material
e
Moisture and dirt could enter
X
Not allowed
O
Allowed
5.2
Mounting the outdoor unit
5.2.1
To provide the installation structure
Make sure the unit is installed level on a sufficiently strong base to
prevent vibration and noise.
NOTICE
When the installation height of the unit needs to be
increased, do not use stands to only support the corners.
≥100 mm
≥100 mm
*
X
Not allowed
O
Allowed (
*
= preferred installation)
▪ The height of the foundation must at least be 150 mm from the
floor. In heavy snowfall areas, this height should be increased,
depending on the installation place and condition.
▪ The preferred installation is on a solid longitudinal foundation
(steel beam frame or concrete). The foundation must be larger
than the grey marked area.
729
≤613
≥929
≥
AB
AA
a
(mm)
Minimum foundation
a
Anchor point (4×)
HP
AA
AB
8
766
992
10~16
1076
1302
▪ Fasten the unit in place using four foundation bolts M12. It is best
to screw in the foundation bolts until their length remains 20 mm
above the foundation surface.
20 mm
NOTICE
▪ Prepare a water drainage channel around the
foundation to drain waste water from around the unit.
During heating operation and when the outdoor
temperatures are negative, the drained water from the
outdoor unit will freeze up. If the water drainage is not
taken care of, the area around the unit might be very
slippery.
▪ When installed in a corrosive environment, use a nut
with plastic washer (a) to protect the nut tightening part
from rust.
a
5.3
Connecting the refrigerant piping
5.3.1
To route the refrigerant piping
Installation of refrigerant piping is possible as front connection or
side connection (when taken out from the bottom) as shown in the
figure below.
a
b
c
a
Left-side connection
b
Front connection
c
Right-side connection
For side connections, the knockout hole on the bottom plate should
be removed: