background image

RXYQQ8~20T7Y1B

VRV IV System Air Conditioner

4P345099-1 – 2013.04 

Installation and operation manual

43

No matter which control is selected, variations on the behaviour of
the system are still possible due to protection controls to keep the
unit operating under reliable conditions. The intentional target,
however, is fixed and will be used to obtain the best balance between
energy consumption and comfort, depending on the application type.

15.4. Test operation

After installation and once the field settings are defined, the installer
is obliged to verify correct operation. Therefore a test run must be
performed according to the procedures described below.

15.4.1. Precautions before starting test operation

During test operation, the outdoor unit and the indoor units will start
up:

Make sure that the preparations of all indoor units are finished
(field piping, electrical wiring, air purge, ...). See installation
manual of the indoor units for details.

Provide a logbook and machine card.
In accordance with the applicable legislation, it may be
necessary to provide a logbook with the equipment containing at
least: info on maintenance, repair work, results of tests, stand-by
periods, …

15.4.2. Test operation

The procedure below describes the test operation of the complete
system. This operation checks and judges following items:

Check of wrong wiring (communication check with indoor units).

Check of the stop valves opening.

Judgement of piping length.

On top of this system test operation, indoor units operation should
also be checked separately.

Make sure to carry out the system test operation after the first
installation. Otherwise, the malfunction code 

U3

 will be displayed

on the user interface and normal operation or individual indoor
unit test run cannot be carried out.

Abnormalities on indoor units cannot be checked for each unit
separately. After the test operation is finished, check the indoor
units one by one by performing a normal operation using the
user interface. Refer to the indoor unit installation manual for
more details concerning the individual test run.

Procedure

Close all front panels in order to not let it be the cause of
misjudgement (except the electrical component box inspection
opening service cover).

Make sure all field settings you want are set; see

"15.2. Monitoring function and field settings" on page 37

.

Turn ON the power to the outdoor unit and the connected indoor
units.

Make sure the default (idle) situation is existing; see

"13.2. Operating the push buttons and DIP switches on the logic
board" on page 29

. Push BS2 for 5 seconds or more. The unit

will start test operation.

The test operation is automatically carried out, the outdoor
unit display will indicate "

t01

" and the indication "Test

operation" and "Under centralized control" will display on the
user interface of indoor units.
Steps during the automatic system test run procedure:
-

"

t01

": control before start up (pressure equalization)

-

"

t02

": cooling start up control

-

"

t03

": cooling stable condition

-

"

t04

": communication check

-

"

t05

": stop valve check

-

"

t06

": pipe length check

-

"

t07

": refrigerant amount check

-

"

t09

": pump down operation

-

"

t10

": unit stop

During the test operation, it is not possible to stop the unit
operation from a user interface. To abort the operation, press
BS3. The unit will stop after ±30 seconds.

CAUTION

Do not insert fingers, rods or other objects into the air inlet
or outlet. When the fan is rotating at high speed, it will
cause injury.

CAUTION

Do not perform the test operation while working on the
indoor units.

When performing the test operation, not only the outdoor
unit, but the connected indoor unit will operate as well.
Working on an indoor unit while performing a test operation
is dangerous.

CAUTION

During tests never pressurize the appliances with a
pressure higher than the maximum allowable
pressure (as indicated on the nameplate of the unit).

If refrigerant gas leaks, ventilate the area immediately.
Toxic gas may be produced if refrigerant gas comes
into contact with fire.

Never directly touch any accidental leaking
refrigerant. This could result in severe wounds caused
by frostbite.

Test run is possible for ambient temperatures between
–20°C and 35°C.

DANGER: Do not touch piping and internal parts.

See 

"2. General safety precautions" on page 2

.

DANGER: Electrical shock

See 

"2. General safety precautions" on page 2

.

INFORMATION

Note that during the first running period of the unit,
required power input may be higher. This phenomenon
originates from the compressor that requires a 50 hour run
elapse before reaching smooth operation and stable power
consumption. Reason is that the scroll is made out of iron
and that it takes some time to smooth the surfaces that
make contact.

NOTICE

To protect the compressor, be sure to turn on the power
supply 6 hours before starting operation.

INFORMATION

It may take 10 minutes to achieve a uniform
refrigerant state before the compressor starts.

During the test operation, the refrigerant running
sound or the magnetic sound of a solenoid valve may
become loud and the display indication may change.
These are not malfunctions.

NOTICE

Be sure to turn on the power 6 hours before operation in
order to have power running to the crankcase heater and
to protect the compressor.

Содержание RXYQQ8T7Y1B

Страница 1: ...INSTALLATION AND OPERATION MANUAL RXYQQ8T7Y1B RXYQQ10T7Y1B RXYQQ12T7Y1B RXYQQ14T7Y1B RXYQQ16T7Y1B RXYQQ18T7Y1B RXYQQ20T7Y1B System Air Conditioner...

Страница 2: ...H HPS R8T 10 12HP 3 6 15 4 5 18 17 7 8 14 1 16 11 12 10 1 2 10 10 13 12 6 11 9 7 14 18 17 8 18 3 5 4 4 5 M sv sv INV INV sv M1C M2C M1F M M2F S1NPH S1NPL S1PH S2PH HPS R6T R5T R7T R1T R4T R8T 10 12HP...

Страница 3: ...A og gjennom positiv bed mmelse av B if lge Sertifikat C som det fremkommer i den Tekniske Konstruksjonsfilen D og gjennom positiv bed mmelse av E Anvendt modul F G Risikokategori H Se ogs neste side...

Страница 4: ...PS vastav k llastunud temperatuur M C Jahutusaine N Surve turvaseadme seadistus P bar Tootmisnumber ja tootmisaasta vaadake mudeli andmeplaati 21 PS K bar TS TSmin L C TSmax PS M C N P bar 22 Maksimal...

Страница 5: ...29 13 3 Connecting the PC configurator to the outdoor unit 30 14 Charging refrigerant 30 14 1 Precautions 30 14 2 Important information regarding the refrigerant used 31 14 3 Calculating the addition...

Страница 6: ...ning service In Europe EN 378 provides the necessary guidance for this logbook 3 Introduction 3 1 General information This installation manual concerns the VRV IV full inverter driven heat pump system...

Страница 7: ...hese here below are prohibited To install the outdoor unit the following optional parts are also required 1 Refrigerant branching kit For the selection of the optimal branching kit please refer to 9 4...

Страница 8: ...1 in the figure below for reference to where following accessories are supplied with the unit INFORMATION Refer to the technical engineering data for the latest option names HP class of outdoor unit 5...

Страница 9: ...onnection 9 52 9 52 9 52 12 7 Bottom connection 9 52 9 52 9 52 12 7 Accessory pipes mm 14 HP 16 HP 18 HP a b a b a b Gas pipe Front connection 25 4 28 6 25 4 28 6 25 4 28 6 Bottom connection 25 4 28 6...

Страница 10: ...main component list may not be existing in the unit Main components see figure 1 figure 2 figure 3 figure 4 1 Compressor M1C 2 Compressor M2C 3 Heat exchanger 4 Fan 5 Fan motor M1F M2F 6 Accumulator 7...

Страница 11: ...ty limits in the event of a refrigerant leak refer to 18 Caution for refrigerant leaks on page 47 1 Personal computer or radio 2 Fuse 3 Earth leakage protector 4 User interface 5 Indoor unit 6 Outdoor...

Страница 12: ...ion may result in the unit turning over 6 2 Weather related precautions Select a place where the rain can be avoided as much as possible Be sure that the air inlet of the unit is not positioned toward...

Страница 13: ...any indicated service space dimensions 4 15x22 5 515 76 765 76 272 328 373 930 97 107 131 179 259 276 122 766 729 137 1685 mm RXYQQ8 12 4 15x22 5 97 272 328 373 1240 107 131 179 259 276 122 1685 76 13...

Страница 14: ...Unpacking Relief the unit from its packing material Take care not to damage the unit when removing the shrink foil with a cutter 1 Remove the 4 bolts fixing the unit to its pallet 2 Make sure that all...

Страница 15: ...en care of the area around the unit might be very slippery When installed in a corrosive environment use a nut with plastic washer 1 to protect the nut tightening part from rust NOTICE If the unit is...

Страница 16: ...e of the main pipes 1 Outdoor unit 2 Main pipes 3 Increase 4 First refrigerant branch kit 5 Indoor unit The pipe thickness of the refrigerant piping shall comply with the applicable legislation The mi...

Страница 17: ...h the number of outdoor units 9 5 System piping length limitations 9 5 1 Piping length restrictions Make sure to perform the piping installation within the range of the maximum allowable pipe length a...

Страница 18: ...pe size of the main pipe then the pipe size of the main pipe has to be increased as well Branch with refnet joint Branch with refnet joint and refnet header Branch with refnet header Single outdoor Ex...

Страница 19: ...g follow the instructions in the installation manual that comes with the kit Only proceed with piping work after considering the limitations on installing listed here and in the chapter 10 2 Connectin...

Страница 20: ...ture and contamination from mixing into the system Block all gaps in the holes for passing out piping and wiring using sealing material field supply the capacity of the unit will drop and small animal...

Страница 21: ...stop valves cut off the lower part of the smaller pinched piping with an appropriate tool e g pipe cutter a pair of nippers Let the remaining oil drip out in case the recovery was not complete Wait un...

Страница 22: ...oint vertically see view B 2 Make sure that the total length of the piping connected to the joint is absolute straight for more than 500 mm Only if a straight field piping of more than 120 mm is conne...

Страница 23: ...Schrader type valve After handling the service port make sure to tighten the service port cover securely For the tightening torque refer to the table below Check for refrigerant leaks after tightenin...

Страница 24: ...eak test and vacuum drying on page 19 10 4 4 Setup 1 Pressure reducing valve 2 Nitrogen 3 Measuring instrument 4 Refrigerant R410A tank siphon system 5 Vacuum pump 6 Charge hose 7 Refrigerant charge p...

Страница 25: ...ing work 12 1 Precautions on electrical wiring work For the existing power supply and transmission wiring check that the specifications match the requirements as described in this chapter and that oth...

Страница 26: ...sure to install an earth leakage protector in accordance with the applicable legislation Failure to do so may cause electric shock or fire Be sure to use a dedicated power circuit never use a power s...

Страница 27: ...rn Y3S Solenoid valve oil 1 Y4S Solenoid valve oil 2 Z1C Z7C Noise filter ferrite core Z1F Noise filter with surge absorber L1 L2 L3 Live N Neutral Field wiring Terminal strip Connector Terminal Prote...

Страница 28: ...500 m Maximum number of branches 16 Maximum number of independent interconnectable systems 10 Up to 16 branches are possible for unit to unit cabling No branching is allowed after branching see figur...

Страница 29: ...Transmission wiring 2 Fix wiring with tie wrap 3 Possible power supply wire entrance hole 6 4 Possible transmission wire entrance hole 6 5 Possible transmission wire entrance hole 6 Fix wiring to pipe...

Страница 30: ...e 7 5 Alternative power supply routing 12 6 3 Precautions when knocking out knockout holes To punch a knockout hole hit on it with a hammer After knocking out the holes we recommend removing any burrs...

Страница 31: ...the indoor units is connected 12 7 2 Connection of wiring to terminals Transmission wiring in outdoor unit 1 Fix to the indicated plastic brackets using field supplied clamping material 2 Wiring betw...

Страница 32: ...ical component box service cover Operate the switches and push buttons with an insulated stick such as a closed ball point pen to avoid touching of live parts Make sure to re attach the inspection cov...

Страница 33: ...ordingly The communication wiring should be checked at first Accessing modes BS1 is used to change the mode you want to access Access mode 1 Push BS1 one time Segment indication changes to Access mode...

Страница 34: ...by pushing BS3 To leave the monitoring function push BS1 2 times you will return to the default situation when shipped from factory 13 2 2 Operating the DIP switches By operating the DIP switches it...

Страница 35: ...ping please take into account following table concerning the weight factor to be allocated It should be substituted in the formula for R When selecting indoor unit following table with connection rati...

Страница 36: ...14 3 Calculating the additional refrigerant charge on page 31 Refrigerant overcharge happened Recover refrigerant to reach R Q Go to step 4a Step 2 3 Open valve C to field piping via liquid stop valv...

Страница 37: ...tically PE charging nearly finished P9 charging finished OR P kg was added during autocharge R Q P Close valve A Push BS1 to leave program Charging is finished Fill in the amount on the additional ref...

Страница 38: ...b If the total amount of refrigerant could not be charged by pre charging then close valve C and go to step 5 Follow step 6 depending on the chosen charging method 5 After pre charging perform the ref...

Страница 39: ...ating close valve A immediately and check whether the segment indication user interface of indoor unit shows P9 This indicates the automatic charging in cooling program was finished successfully If du...

Страница 40: ...nel The voltage must correspond to the voltage on the identification label of the unit 4 Earth wiring Be sure that the earth wires have been connected properly and that the earth terminals are tighten...

Страница 41: ...mes The second method is to enable low noise operation based on an external input For this operation an optional accessory is required 1 2 shows the status of power consumption limitation operation 1...

Страница 42: ...limitation via external control adaptor DTA104A61 62 If the system needs to be running under low noise operation or under power consumption limitation conditions when an external signal is sent to th...

Страница 43: ...a the external control adaptor DTA104A61 62 If the system needs to be running under power consumption limitation conditions when an external signal is sent to the unit this setting defines the level p...

Страница 44: ...e customer The selection method of indoor units is important and has to be considered as the available capacity is not the same as under basic operation For details concerning to Hi sensible applicati...

Страница 45: ...hieve the required room temperature very fast The overshoot is not allowed from the start up moment The start up occurs under the condition which is defined by the operation mode above In case of cool...

Страница 46: ...temperature evolution A Indoor unit set temperature B Operation start C Operating time D Mild E Quick F Powerful Example Automatic mode during heating A Virtual load curve default automatic mode peak...

Страница 47: ...witches on the logic board on page 29 Push BS2 for 5 seconds or more The unit will start test operation The test operation is automatically carried out the outdoor unit display will indicate t01 and t...

Страница 48: ...d stop valve 18 Refrigerant overcharge Stop valve closed Check refrigerant amount recharge unit Open stop valves E4 01 02 03 Low pressure malfunction Stop valve closed Refrigerant shortage Indoor unit...

Страница 49: ...26 29 INV2 power phase loss Check if power supply is within range U3 03 Malfunction code System test run not yet executed system operation not possible Execute system test run U4 01 Faulty wiring to Q...

Страница 50: ...GER Electrical shock See 2 General safety precautions on page 2 CAUTION When performing service to inverter equipment 1 Do not open the electrical component box cover for 10 minutes after the power su...

Страница 51: ...l applicable regulations and standards for the maximum allowable concentration level is required According to the appropriate European Standard the maximum allowed concentration level of refrigerant t...

Страница 52: ...ty devices High pressure switch Fan driver overload protector Inverter overload protector PC board fuse a Nominal cooling capacities are based on indoor temperature 27 C DB and 19 C WB outdoor tempera...

Страница 53: ...fault circuit interrupter earth leakage circuit breaker A 20 25 32 Total overcurrent amps TOCA e e TOCA means the total value of each OC set A 17 3 24 6 35 4 Full load amps FLA f f FLA nominal running...

Страница 54: ...cified for a certain product or application which explains if relevant how to install configure operate and or maintain the product or application Dealer Sales distributor for products as per the subj...

Страница 55: ...lectric shock and fire Do not insert fingers rods or other objects into the air inlet or outlet When the fan is rotating at high speed it will cause injury Never let the indoor unit or the user interf...

Страница 56: ...lems may happen For checking and adjusting the internal parts contact your dealer Do not touch the heat exchanger fins These fins are sharp and could result in cutting injuries NOTICE Never put any ob...

Страница 57: ...peration operation will restart automatically after the power turns back on again 6 1 Cooling heating fan only and automatic operation Changeover cannot be made with a user interface whose display sho...

Страница 58: ...starts operating 3 Press the air flow direction adjust button only for Double flow Multi flow Corner Ceiling suspended and Wall mounted Refer to 6 3 Adjusting the air flow direction on page 54 for det...

Страница 59: ...a room during cooling operation by using curtains or blinds Ventilate often Extended use requires special attention to ventilation Keep doors and windows closed If the doors and windows remain open a...

Страница 60: ...ars 8 2 Maintenance before a long stop period e g at the end of the season Let the indoor units run in fan only operation for about half a day in order to dry the interior of the units Refer to 6 1 Co...

Страница 61: ...eard immediately after the power supply is turned on The electronic expansion valve inside an indoor unit starts working and makes the noise Its volume will reduce in about one minute A continuous low...

Страница 62: ...After sales service and warranty 11 1 Warranty period This product includes a warranty card that was filled in by the dealer at the time of installation The completed card has to be checked by the cus...

Страница 63: ...mponents Refer to your maintenance and inspection contract for more details Table 2 Replacement Cycle list indicates recommended intervals of replacement cycles However in order to keep the unit opera...

Страница 64: ...rmistor malfunction P8 Autocharge operation related P9 Autocharge operation related PE Autocharge operation related PJ Capacity setting malfunction outdoor U0 Abnormal low pressure drop faulty expansi...

Страница 65: ......

Страница 66: ......

Страница 67: ......

Страница 68: ...4P345099 1 2013 04 Copyright 2013 Daikin 4P345099 1 0000000S...

Отзывы: