![Daikin RXS100HVMA Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/daikin/rxs100hvma/rxs100hvma_service-manual_2459941026.webp)
Removal of PCBs
Si00-978
24
Removal Procedure
4. Removal of PCBs
Procedure
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure
Points
1
Remove the cover.
Preparation
Remove the electrical box
according to the “Removal of
Electrical Box”.
2
Disconnect the
connectors [S52]
[S102] from the service
monitor PCB.
3
Detach the 4 clamps
with pliers and remove
the service monitor
PCB.
Cover
(R9611)
Service monitor PCB
[S52]
[S102]
(R16707)
Clamp
(R16708)