7
|
Piping installation
Installer reference guide
41
RXQ-A_ARXQ-A
R32 split series
4P513661-11P – 2021.11
2
Leave as is for 4-5 minutes and check the pressure:
If the pressure…
Then…
Does not change
There is no moisture in the system.
This procedure is finished.
Increases
There is moisture in the system. Go
to the next step.
3
Vacuum the system for at least 2 hours to a manifold pressure of −0.1 MPa
(−1 bar).
4
After turning the pump OFF, check the pressure for at least 1 hour.
5
If you do NOT reach the target vacuum or CANNOT maintain the vacuum for
1 hour, do the following:
▪
Check for leaks again.
▪
Perform vacuum drying again.
NOTICE
Make sure to open the stop valves after installing the refrigerant piping and
performing vacuum drying. Running the system with the stop valves closed may
break the compressor.
INFORMATION
After opening the stop valve, it is possible that the pressure in the refrigerant piping
does NOT increase. This might be caused by e.g. the closed state of the expansion
valve in the outdoor unit circuit, but does NOT present any problem for correct
operation of the unit.
Содержание RXQ35AMV1B
Страница 1: ...Installer reference guide R32 split series RXQ25AMV1B RXQ35AMV1B ARXQ25AMV1B ARXQ35AMV1B...
Страница 66: ......
Страница 67: ......
Страница 68: ...4P513661 11P 2021 11 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...