Si001271EE
PCBs
Removal Procedure
9
3. PCBs
Warning
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Step
Procedure
Points
1
Remove the cover of
the electrical box.
Release the 4 hooks. The
hooks are indicated by
W
.
2
Disconnect the
connectors [S52]
[S102] from the service
monitor PCB.
[S52], [S102]: to main PCB
3
Detach the 4 clamps
with pliers and remove
the service monitor
PCB.
4
5
Remove the screws of
the terminal board and
the earth / ground wire.
Unfasten the hook on
the right.
Hook
Hook
(R18913)
Cover
(R6427)
Service monitor PCB
[S52]
[S102]
(R16707)
Clamp
(R16708)
(R18968)
Terminal board
Earth / ground wire
Hook