Installation and Application Considerations - Remote Evaporators
www.DaikinApplied.com 33
IOM 1242-8 • PATHFINDER
®
MODEL AWV CHILLERS
colored white, black, green, and red but not necessary
provided notation is made on schematic to aid field
servicing of equipment. When sourcing extension cable,
consideration should be given towards Belden 83754 for
14 AWG or equivalent as suitable. The inner foil shield
and the outer braid shield should be grounded as close
as possible to the EXV module in the control cabinet.
The expansion valve wiring cannot run in conduit with
other wiring that is over 24 Volts AC.
6.
A flow switch must be installed in the leaving chilled
water line per manufacturer’s instructions and wired to
terminals 8 and 23 on terminal block M5 in the chiller
control panel. See Unit Field Wiring Diagrams -
and
If additional length of cable is required,
splice a 4 conductor, shielded cable, with drain wire. This
cable needs to be a minimum of 22 AWG. Preferably the
conductors are colored white, black, blue, and brown but
not necessary provided notation is made on schematic
for field servicing of equipment. When sourcing cable,
consideration should be made towards Belden 8729,
8723, 9940, or equivalent as suitable.
Figure 54: Piping Schematic, Remote Evaporator (One of Two Circuits)
CHARGING
VALVE
LIQUID
PIPING
FILTER
DRYER
SOLENOID
VALVE
(OPTIONAL)
EXPANSION
VALVE
WATER IN
WATER OUT
DX EVAPORATOR
SUCTION
PIPING
OIL PRESS.
TRANSDUCER
WITH SCHRADER
VALVE
DISCHARGE
PIPING
AIR
FLOW
AIR
FLOW
CONDENSER
ASSEMBLY
F3/F4
COMPRESSOR
RELIEF
VALVE
SUCTION
TEMP. SENSOR
SUCTION
TRANSDUCER
DISCHARGE
TEMP. SENSOR
(WOE)
TEMP. SENSOR
(WIE)
TEMP. SENSOR
OUTSIDE AIR
TEMPERATURE
(WAA)
BALL
VALVE
CHARGING
VALVE
SHUT-OFF
VALVE
RELIEF
VALVE
DISCHARGE
TRANSDUCER
STRAINER
BALL
VALVE
SOLENOID
VALVE
LIQUID
INJECTION
PIPING
SCHRADER
VALVE
SCHRADER
VALVE
SHUT-OFF
VALVE
FIELD
CONNECTION
POINT
FIELD
CONNECTION
POINT
CHARGING
VALVE
SCHRADER
VALVE
FIELD INSTALLED LIQUID LINE COMPONENTS
FIELD PIPING
SHOWN DASHED
LOW
PRESSURE
SWITCH
CHARGING
VALVE
RELIEF
VALVE
CHECK
VALVE
SCHRADER
VALVE
SCHRADER
VALVE
CHARGING
VALVE
LIQUID
PIPING
FILTER
DRYER
SOLENOID
VALVE
(OPTIONAL)
EXPANSION
VALVE
WATER IN
WATER OUT
DX EVAPORATOR
SUCTION
PIPING
OIL PRESS.
TRANSDUCER
WITH SCHRADER
VALVE
DISCHARGE
PIPING
AIR
FLOW
AIR
FLOW
CONDENSER
ASSEMBLY
F3/F4
COMPRESSOR
RELIEF
VALVE
SUCTION
TEMP. SENSOR
SUCTION
TRANSDUCER
DISCHARGE
TEMP. SENSOR
(WOE)
TEMP. SENSOR
(WIE)
TEMP. SENSOR
OUTSIDE AIR
TEMPERATURE
(WAA)
SCHRADER
VALVE
SCHRADER
VALVE
BALL
VALVE
CHARGING
VALVE
ECONOMIZER
SHUT-OFF
VALVE
ECONOMIZER FLASH GAS TO COMPRESSOR INTERSTAGE
RELIEF
VALVE
DISCHARGE
TRANSDUCER
BALL
VALVE
LIQUID
INJECTION
PIPING
SOLENOID
VALVE
ECON.
TRANSDUCER
STRAINER
CHARGING
VALVE
SCHRADER
VALVE
TEMP. SENSOR
ECON.
EXV. VALVE
SHUT-OFF
VALVE
FILTER
DRYER
SCHRADER
VALVE
CHARGING
VALVE
FIELD
CONNECTION
POINT
FIELD
CONNECTION
POINT
FIELD PIPING
SHOWN DASHED
FIELD INSTALLED LIQUID LINE COMPONENTS
LOW
PRESSURE
SWITCH
CHECK
VALVE
RELIEF
VALVE
SCHRADER
VALVE
REMOTE CHILLER
WITH OPTIONAL ECONOMIZER
Содержание Pathfinder AWV
Страница 4: ...THIS PAGE INTENTIONALLY LEFT BLANK ...