
39
How to Run System Test for Inverter Outdoor Units
Navigate to system optimization > system test > Inverters only
»
On initial power-up the inverter heat pump or air conditioner will
display code E11, signaling that initial system test must be run.
»
System test is required to check the equipment settings and functionality.
»
Once selected, it checks the equipment for approximately 10-15
minutes. System test may exceed 15 minutes if there is an error.
»
While the system test is active
“test running”
message shows
up on the screen.
»
System test is complete only when display code E11 notice clears
from the seven segment LED display on the heat pump or air
conditioner. Please wait for test to complete and for code to clear.
»
As soon as the test completes, “test running” message is cleared
from the screen.
Full set-up
SYS
TE
M P
O
W
ER
-U
P
Содержание One+
Страница 1: ...Daikin One smart thermostat Reference Guide...
Страница 4: ......
Страница 5: ...Introduction...
Страница 14: ...14 Wiring Diagram...
Страница 16: ...16 Wiring Diagram...
Страница 20: ...20 Wiring Troubleshooting View of the DS1 Switch on the Outdoor Unit PC Boards 1 17 SEER Daikin Fit...
Страница 21: ...21 INTRODUCTION 2 18 SEER all tonnage...
Страница 22: ...22 Wiring Troubleshooting 3 20 SEER 2 and 3 Ton...
Страница 23: ...23 INTRODUCTION 4 20 SEER 4 Ton...
Страница 24: ...24 Wiring Troubleshooting 5 20 SEER 5 Ton...
Страница 25: ......
Страница 26: ......
Страница 27: ...System Power Up...
Страница 28: ......
Страница 47: ...47 SYSTEM POWER UP...
Страница 49: ......
Страница 50: ......
Страница 51: ...References...
Страница 53: ...53 REFERENCES...
Страница 67: ...67 Notes...
Страница 68: ...68 Notes...
Страница 69: ...69 Notes...
Страница 70: ...70 Notes...