Two paths for commissioning a system:
•
Quick set-up
•
Full set-up.
•
Quick set-up
enables installers to run emergency heating or cooling before completing the full set-
up process.
•
Full set-up
walks installers through the entire commissioning process to ensure the system is
configured properly and ready for the homeowner to use.
•
Enables random access to any setting.
•
Remembers settings as they are entered.
•
Individual may stop and restart as needed.
•
The commissioning workflow uses the
auto-discovery
process, on the ComfortNet, to identify
equipment in the home.
•
The screens are populated based on the model numbers of the discovered devices, matched to a
database of device configuration settings.
Commissioning Daikin One+