Maintenance
www.DaikinApplied.com 45
IM 972-2 • MAVERICK I ROOFTOP SYSTEMS
Figure 38: System Charging Chart: MPS 020B
20 TON, CIRCUITS 1 & 2
55
65
75
85
95
105
115
225
250
275
300
325
350
375
400
425
450
475
500
525
550
575
100
105
110
115
120
125
130
135
140
145
150 155
160 165
225
250
275
300
325
350
375
400
425
450
475
500
525
550
575
100
105
110
115
120
125
130
135
140
145
150 155
160 165
55
65
75
85
95
105
115
20 TON, CIRCUIT 1
20 TON, CIRCUIT 2
BOTH COMPRESSORS MUST BE OPERATING BEFORE CHECKING
REFRIGERANT CHARGE.
BEFORE FINAL REFRIGERANT CHECK!
RETURN AIR TEMPERATURE MUST BE WITHIN COMFORT CONDITIONS
MEASURE PRESSURE AT COMPRESSOR SUCTION AND DISCHARGE.
MEASURE OUTDOOR AMBIENT TO UNIT.
PLACE (X) ON CHART WHERE SUCTION AND DISCHARGE INTERSECT.
IF (X) IS BELOW OUTDOOR AMBIENT LINE, ADD CHARGE AND REPEAT
STEPS 1-3.
IF (X) IS ABOVE OUTDOOR AMBIENT LINE, RECOVER EXCESS CHARGE
AND REPEAT STEPS 1-3.
CAUTION:
INSTRUCTIONS:
DISCHARGE PRESSURE (PSIG)
OUTDOOR
AMBIEN
T (
F, DB)
SUCTION PRESSURE (PSIG)
DISCHARGE PRESSURE (PSIG)
OUTDOOR
AMBIEN
T (
F, DB)
SUCTION PRESSURE (PSIG)
SYSTEM CHARGE CHART - REFRIGERANT 410A
Содержание Maverick I
Страница 51: ......