23
10. AUTOMATIC PUMP DOWN
An automatic pump down system is applied to the unit to prevent the unit operation from extra
decreasing of low pressure due to pump down operation or burning of scroll compressor due to close
stop valve.
(1) Controller operation
Press the
key twice to select the pump down mode, then, the LCD indicates "P down".
Select "ON" by using
key or
key, and press the
key to start the automatic pump down
operation.
MODE
M
™
Controller indication
COMP.
DEFROST IN RANGE
DE-HUMID.
SUPPLY
RETURN
ALARM
R.H.
DISPLAY SELECT G SET
G SET
MANUAL
UNIT
UP
SELECT
SET
DEFROST
ON/OFF
˚C F
8
CHERT
/
/
I
/
O
S
DOWN
ENTER/ESC
Pump down mode
Pump down completed
COMP.
DEFROST IN RANGE
DE-HUMID.
SUPPLY
RETURN
ALARM
R.H.
DISPLAY SELECT
MANUAL
UNIT
UP
SELECT
SET
DEFROST
ON/OFF
˚C F
8
CHERT
/
/
I
/
O
S
DOWN
ENTER/ESC
DISPLAY
ON/OFF
DISPLAY
ON/OFF
•When the pump down
operation is ended
abnormally, "E201"
(pump down malfunction)
will be indicated.
•When the pump down
operation is completed,
the unit becomes stop
state.
Press
key to start
pump down
Fig. 2
Fig. 1
Current indication mode
(Operation condition
ndication)
G-set mode
(Energy saving
setting)
※
1
Pump
down
operation
Dehumidification
ON-A•OFF setting
MODE
M
MODE
M
MODE
M
MODE
M
※
1: When the dehumidification ON-AoOFF is set to ON, G-Set operating mode will be skipped.
P001-028̲S/G-A4 英(LEX10E-A18A) 2006.04.21 20:17 ページ 23
https://daikin-p.ru
Содержание LXE10E-A18A
Страница 30: ...15 APPENDIX 15 1 Refrigerant piping diagram 29 https daikin p ru ...
Страница 33: ...32 https daikin p ru ...
Страница 38: ...37 1 部品名称 1 1 庫外側 q レヒートコイル電磁弁 Trans FRESH RSV DSV BSV HSV ESV ISV 1 https daikin p ru ...
Страница 39: ...38 1 2 庫内側 1 3 2 q レヒートコイル w USDAレセプタクル e パソコンポートレセプタクル https daikin p ru ...
Страница 57: ...56 11 ケーブルクランプ金具 トレーラ 鉄道シャーシ上で運転する場合は 必ず で電源ケーブルを固定しておくこと ケーブルクランプ ケーブルクランプ 緩める 固定する https daikin p ru ...
Страница 61: ...60 CA装置取付位置例 庫内側 Trans FRESH ASS Y A4 A5 CABLES W MOUNTING BOX q https daikin p ru ...
Страница 62: ...15 付図 15 1 配管系統図 61 https daikin p ru ...
Страница 65: ...64 https daikin p ru ...
Страница 69: ...Parts related with the unit outside 庫外関連部品 68 TR05 09A https daikin p ru ...
Страница 73: ...Parts related with refrigerant piping outside 庫外冷媒配管関連部品 72 TR05 09A https daikin p ru ...
Страница 77: ...Parts related with the unit inside 庫内関連部品 76 TR05 09A https daikin p ru ...
Страница 81: ...Parts related with refrigerant piping inside 庫内冷媒配管関連部品 80 TR05 09A https daikin p ru ...
Страница 83: ...Other parts Pipe clamp sealing and insulation material etc その他部品 配管固定具 シール材 防熱材等 82 TR05 09A https daikin p ru ...
Страница 84: ...Other parts Pipe clamp sealing and insulation material etc その他部品 配管固定具 シール材 防熱材等 83 TR05 09A https daikin p ru ...
Страница 85: ...Other parts Pipe clamp sealing and insulation material etc その他部品 配管固定具 シール材 防熱材等 84 TR05 09A https daikin p ru ...
Страница 86: ...Other parts Pipe clamp sealing and insulation material etc その他部品 配管固定具 シール材 防熱材等 85 TR05 09A https daikin p ru ...
Страница 87: ...Other parts Pipe clamp sealing and insulation material etc その他部品 配管固定具 シール材 防熱材等 86 TR05 09A https daikin p ru ...
Страница 91: ...Control box コントローラボックス 90 TR05 09A https daikin p ru ...
Страница 92: ... 91 TR05 09A Control box コントローラボックス https daikin p ru ...
Страница 95: ...Parts related with name plate 銘板関連 94 TR05 09A https daikin p ru ...
Страница 96: ...Parts related with name plate 銘板関連 95 TR05 09A https daikin p ru ...
Страница 99: ...Parts related with option 1 Recorder box オプション関連部品1 レコーダボックス 98 TR05 09A https daikin p ru ...
Страница 105: ...Storage for power cable ケーブル収納 104 TR05 09A https daikin p ru ...
Страница 107: ...Parts related with option 4 TRANS FLESH オプション関連部品4 トランス フレッシュ 106 TR05 09A https daikin p ru ...
Страница 119: ...MEMO https daikin p ru ...