
14
6. OPERATION PROCEDURE
6.1 Operation procedure flow chart
S
S
S
I/O ON
I/O
OFF
I/O
S
I/O Unit On / Off key
S key
Select key
Enter key
8 / Chart key
CHART
CHART
CHART
Difference from
standard model
Difference from
standard model
Power OFF
Unit OFF
All indication
light on
(for 3 sec.)
Starting
preparation
(for 18 sec.)
※
1
Current
indication
(Operation state)
When no power supply
Non operation for 30 sec.
Circuit Breaker ON
Circuit Breaker OFF
after setting change
( OFF when no settig change)
※
3
Battery mode, Operation Condition Setting with back-up battery
(Set Point Temperature˚C / Humidity %, / Defrost Internal)
for 3 sec.
for 3 sec.
for 3 sec.
for 3 sec.
※
12
※
13
※
2 Operation Setting (Set Point Temperature˚C, Humidity %, Defrost Internal)
※
9 Sensor Indication
※
7 Chart Indication
※
10 Temperature
Record Scroll
※
11 Alarm
Record Scroll
※
15
※
14
※
16
or non operation for 5 min.
or non operation for 5 min.
※
G-SET operation
(
The energy consumption
reducing operation
)
※
4 Dehumidification
ON-A
・
OFF setting
※
4 Automatic
pump down
F. PTI
S. PTI
M. CHECK
※
17
Logging data can be down loaded even when the power supply OFF, the unit OFF
or the unit in operation.
To down load the data during the power supply OFF, press the key for using
the wake-up battery.
Optional
Function
Setting
Basic
Function
Setting
Optional
Condition
Setting
Container
I.D & Time
Setting
for 3 sec.
MODE
M
MODE
M
MODE
M
MODE
M
P001-028̲S/G-A4 英(LEX10E-A18A) 2006.04.21 20:17 ページ 14
https://daikin-p.ru
Содержание LXE10E-A18A
Страница 30: ...15 APPENDIX 15 1 Refrigerant piping diagram 29 https daikin p ru ...
Страница 33: ...32 https daikin p ru ...
Страница 38: ...37 1 部品名称 1 1 庫外側 q レヒートコイル電磁弁 Trans FRESH RSV DSV BSV HSV ESV ISV 1 https daikin p ru ...
Страница 39: ...38 1 2 庫内側 1 3 2 q レヒートコイル w USDAレセプタクル e パソコンポートレセプタクル https daikin p ru ...
Страница 57: ...56 11 ケーブルクランプ金具 トレーラ 鉄道シャーシ上で運転する場合は 必ず で電源ケーブルを固定しておくこと ケーブルクランプ ケーブルクランプ 緩める 固定する https daikin p ru ...
Страница 61: ...60 CA装置取付位置例 庫内側 Trans FRESH ASS Y A4 A5 CABLES W MOUNTING BOX q https daikin p ru ...
Страница 62: ...15 付図 15 1 配管系統図 61 https daikin p ru ...
Страница 65: ...64 https daikin p ru ...
Страница 69: ...Parts related with the unit outside 庫外関連部品 68 TR05 09A https daikin p ru ...
Страница 73: ...Parts related with refrigerant piping outside 庫外冷媒配管関連部品 72 TR05 09A https daikin p ru ...
Страница 77: ...Parts related with the unit inside 庫内関連部品 76 TR05 09A https daikin p ru ...
Страница 81: ...Parts related with refrigerant piping inside 庫内冷媒配管関連部品 80 TR05 09A https daikin p ru ...
Страница 83: ...Other parts Pipe clamp sealing and insulation material etc その他部品 配管固定具 シール材 防熱材等 82 TR05 09A https daikin p ru ...
Страница 84: ...Other parts Pipe clamp sealing and insulation material etc その他部品 配管固定具 シール材 防熱材等 83 TR05 09A https daikin p ru ...
Страница 85: ...Other parts Pipe clamp sealing and insulation material etc その他部品 配管固定具 シール材 防熱材等 84 TR05 09A https daikin p ru ...
Страница 86: ...Other parts Pipe clamp sealing and insulation material etc その他部品 配管固定具 シール材 防熱材等 85 TR05 09A https daikin p ru ...
Страница 87: ...Other parts Pipe clamp sealing and insulation material etc その他部品 配管固定具 シール材 防熱材等 86 TR05 09A https daikin p ru ...
Страница 91: ...Control box コントローラボックス 90 TR05 09A https daikin p ru ...
Страница 92: ... 91 TR05 09A Control box コントローラボックス https daikin p ru ...
Страница 95: ...Parts related with name plate 銘板関連 94 TR05 09A https daikin p ru ...
Страница 96: ...Parts related with name plate 銘板関連 95 TR05 09A https daikin p ru ...
Страница 99: ...Parts related with option 1 Recorder box オプション関連部品1 レコーダボックス 98 TR05 09A https daikin p ru ...
Страница 105: ...Storage for power cable ケーブル収納 104 TR05 09A https daikin p ru ...
Страница 107: ...Parts related with option 4 TRANS FLESH オプション関連部品4 トランス フレッシュ 106 TR05 09A https daikin p ru ...
Страница 119: ...MEMO https daikin p ru ...