The hydronic heat section can be supplied with a short (4¼''
high) control box or a long (13½'' high) control box depend-
ing on the number of options selected. Observe the control
box to determine which one was supplied for the job.
Short Control Box
If the short control box was supplied, field wiring should be
brought into the 2'' × 4'' junction box which is located on the
right-hand side of the heat section (Figure 16).
Figure 16: Hydronic Heat Section with Short Control Box
Note: The short control box is used with standard unit mounted manual changeover control, and unit mounted manual
changeover with emergency standby (ESB) power supply.
Side View
Room Cabinet Removed
Front View
A
M
J
K
L
D
Junction Box
8"
(203mm)
Short
Control Box
Room
Cabinet
Room Cabinet
Mounting Holes (4)
1
⁄
2
''
(12mm)
1
⁄
4
''
(6mm)
G
F
B
P
N
E
Wall Box
Hydronic Coil
H
A
D
E
F
G
H
J
K
L
M
N
P
in.
45
3
⁄
4
37
25
1
⁄
2
24
1
⁄
2
13
11
⁄
16
22
7
⁄
8
10
16
4
1
⁄
2
1
1
⁄
2
14
3
⁄
4
1
3
⁄
4
mm
1162
940
648
622
348
581
254
406
114
38
375
44
Notes:
See
Figure 6 through Figure 13 on page 8
for dimensions of factory installed valve and return piping stub.
Junction box 7/8" (22mm) diameter knockouts for 1/2" (12mm) conduit.
See Table 6 for dimension B.
Table 6: Wall Box Dimensions
Dimensions - inches
Wall Box “B”
Dimension
007–014
2
1
⁄
2
3
1
⁄
2
4
5
6
7
8
9
10
Overall Length
10
1
⁄
2
11
1
⁄
2
12
13
14
15
16
17
18
Dimensions - mm
Wall Box “B”
Dimension
007–014
64
89
102
127
152
178
203
229
254
Overall Length
267
292
305
330
356
381
406
432
457
Содержание IM 1068-2
Страница 26: ...IM 1068 2 Page 26 of 28 ...
Страница 27: ...IM 1068 2 Page 27 of 28 ...