16
|
Unit installation
Installer and user reference guide
55
FXUA50~100AVEB
VRV system air conditioner
4P673843-1 – 2022.01
When the horizontal blade is difficult to remove, slowly push it down to make
removal easier.
Fix the blocking pad to the air outlet.
f
d
e
c
b
f
e
a
1
h
b
d c
g
3
2
d
a
a
b
1
1
2
2
3
3
a
Protruding part
b
Blocking pad
c
Drain pan
d
Lower decoration panel
e
Insulation
f
Upper decoration panel
g
Bent part of blocking pad
h
Space between lower decoration panel and drain pan
1
Insert the protruding part (2 locations) of the blocking pad into the space
between the upper decoration panel and the insulation.
2
Insert the bent parts (2 locations) at the ends of the blocking pad a little into
the space between the lower decoration panel and insert the blocking pad.
▪
If the blocking pad is difficult to insert, first loosen the screws on both sides of
the lower decoration panel and then insert it.
a b
b a
2×
2×
a
a
b
b
A
B
A
Side without piping connection
B
Side with piping connection
a
Lower decoration panel
b
Screw
3
Insert the bent parts (2 locations) at the middle of the blocking pad into the
space between the lower decoration panel and the drain pan until you hear a
clicking sound.
4
Check that the sheet metal section of the blocking pad does not protrude
from the lower decoration panel.