7
|
Before operation
Installer and user reference guide
26
FXUA50~100AVEB
VRV system air conditioner
4P673843-1 – 2022.01
7 Before operation
WARNING
This unit contains electrical and hot parts.
WARNING
Before operating the unit, be sure the installation has been carried out correctly by
an installer.
CAUTION
It is unhealthy to expose your body to the air flow for a long time.
CAUTION
To avoid oxygen deficiency, ventilate the room sufficiently if equipment with burner
is used together with the system.
CAUTION
Do NOT operate the system when using a room fumigation-type insecticide.
Chemicals could collect in the unit, and endanger the health of people who are
hypersensitive to chemicals.
NOTICE
Be sure to turn ON the power 6 hours before operation in order to have power
running to the crankcase heater and to protect the compressor.
This operation manual is for the following systems with standard control. Before
initiating operation, contact your dealer for the operation that corresponds to your
system type and mark. If your installation has a customised control system, ask
your dealer for the operation that corresponds to your system.