![Daikin FXFQ12MVJU Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/daikin/fxfq12mvju/fxfq12mvju_installation-manual_2459718006.webp)
5
(4) Use suspension bolts for installation. Check whether
the ceiling is strong enough to support the weight of
the unit or not. If there is a risk, reinforce the ceiling
before installing the unit.
(Installation pitch is marked on the paper pattern for instal-
lation. Refer to it to check for points requiring reinforcing.)
(length: in.)
4. PREPARATIONS BEFORE INSTALLA-
TION
(1) Relation of ceiling opening to unit and suspension bolt
position
■
Installation is possible when ceiling opening dimensions is
as follows.
• When installing the unit within the frame for fixing false
ceiling.
Model
H
FXFQ12 · 18 · 24MVJU
9 7/16 or more
FXFQ30 · 36MVJU
11 3/4 or more
Содержание FXFQ12MVJU
Страница 15: ...14 MEMO...