![Daikin FXFQ12MVJU Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/daikin/fxfq12mvju/fxfq12mvju_installation-manual_2459718010.webp)
9
• Use the attached drain hose 1) and clamp metal 2).
Insert the drain hose into the drain socket, up to the white
tape. Tighten the clamp until the screw head is less than
3/16” from the hose.
•
Be sure to insulate the 2 below indicated spots.
If uninsulated, there is always the possibility of conden-
sation forming and leaking.
• The drain piping inside the building
• Drain socket
• Wrap the attached sealing pad 10) (Large) over the clamp
and drain hose to insulate, as shown in the drawing below.
〈
NOTE FOR DRAIN RAISING PIPING
〉
• Install the drain raising pipes at a height of less than 21 5/8”.
• Install the drain raising pipes at a right angle to the indoor unit
and no more than 11 13/16” from the unit.
NOTE
• The incline of attached drain hose 1) should be 2 15/16” or
less so that the drain socket does not have to stand addi-
tional force.
• If converging multiple drain pipes, install according to the
procedure shown below.
Select converging drain pipes whose gauge is suitable for the
operating capacity of the unit.
NOTE
• Drain piping connections
Do not connect the drain piping directly to sewage pipes that
smell of ammonia. The ammonia in the sewage might enter
the indoor unit through the drain pipes and corrode the heat
exchanger.
• Keep in mind that it will become the cause of getting drain
pipe blocked if water collects on drain pipe.
(2) After piping work is finished, check if drainage flows
smoothly.
• Open the water inlet lid, add approximately 37 in
3
of water
slowly and check drainage flow.
WHEN ELECTRIC WIRING WORK IS FINISHED
• Check drainage flow during COOL running, explained under
“TEST OPERATION”.
WHEN ELECTRIC WIRING WORK IS NOT FINISHED
• Remove the electric parts box lids, connect a power supply
and remote controller to the terminals.
(Refer to the “HOW TO CONNECT WIRINGS” (P.10))
Next, press the inspection/test operation button “
” on the
remote controller. The unit will engage the test operation
mode. Press the operation mode selector button “
” until
selecting FAN OPERATION “
”. Then, press the ON/OFF
button “
”. The indoor unit fan and drain pump will start up.
Check that the water has drained from the unit. Press “
”
to go back to the first mode.
Содержание FXFQ12MVJU