English
13
English
Trial Operation and Testing
1.
Trial operation and testing
1-1 Measure the supply voltage and make sure that it falls in the specified range.
1-2 Trial operation should be carried out in either cooling or heating mode.
• In cooling mode, select the lowest programmable temperature; in heating mode, select the highest programmable
temperature.
1) Trial operation may be disabled in either mode depending on the room temperature.
Use the remote controller for trial operation as described below.
2) After trial operation is complete, set the temperature to a normal level (26°C to 28°C in cooling mode, 20°C to 24°C
in heating mode).
3) For protection, the system disables restart operation for 3 minutes after it is turned off.
1-3 Carry out the test operation in accordance with the operation manual to ensure that all functions and parts,
such as louver movement, are working properly.
• The air conditioner requires a small amount of power in its standby mode. If the system is not to be used for some
time after installation, shut off the circuit breaker to eliminate unnecessary power consumption.
• If the circuit breaker trips to shut off the power to the air conditioner, the system will restore the original operation
mode when the circuit breaker is opened again.
2.
Test items
* If the
is not displayed, make sure not to cut the switching
jumper (J8) for cooling operation when cutting the address
jumper.
If it has been cut, replace the remote controller.
Trial operation from remote controller
1) Press “ON/OFF” button to turn on the system.
2) Press “TEMP” button (2 locations) and “MODE” button at the same time.
3) Press “TEMP” button and select “ ”.
4) Press “MODE” button.
5) Trial operation terminates in approx. 30 minutes and switches into normal mode. To quit a trial operation, press
“ON/OFF” button.
Test items
Symptom
(diagnostic display on RC)
Check
Indoor and outdoor units are installed properly on solid bases.
Fall, vibration, noise
No refrigerant gas leaks.
Incomplete cooling/heating function
Refrigerant gas and liquid pipes and indoor drain hose extension are
thermally insulated.
Water leakage
Draining line is properly installed.
Water leakage
System is properly earthed.
Electrical leakage
The specified wires are used for inter-unit wiring.
Inoperative or burn damage
Indoor or outdoor unit’s air inlet or air outlet has clear path of air.
Incomplete cooling/heating function
Stop valves are opened.
Incomplete cooling/heating function
Indoor unit properly receives remote control commands.
Inoperative
will appear when the MODE button is pressed.*
No heating
Jumper (J8)
Содержание FTXS35K2V1B
Страница 18: ......
Страница 19: ......
Страница 20: ...3P363588 2B 2014 06 Copyright 2013 Daikin ...