6
A
B
Air filter
M4 x 12L
Air-Purifying Filter with
bacteriostatic virustatic function (2)
Front panel
75mm or more from ceiling
50mm or more from walls
(on both sides)
Air filter
Air-Purifying Filter
with bacteriostatic
virustatic function
Filter frame
Tab
Caulk pipe
hole gap
with putty.
Cut thermal insulation pipe
to an appropriate length and
wrap it with tape, making
sure that no gap is left in the
insulation pipe’s cut line.
Wrap the insulation pipe with
the finishing tape from bottom
to top.
■
Opening service lid
Service lid is opening/
closing type.
■
Opening method
1) Remove the service lid
screws.
2) Pull out the service lid
diagonally down in the
direction of the arrow.
3) Pull down.
500mm from wall
INSTALLATION DIAGRAM
Indoor unit
Outdoor Unit
Service lid
INSTALLATION OF THE OUTDOOR UNIT
The outdoor unit must be installed in such a way, so as to
prevent short circuit of the hot discharged air or obstruction to
the smooth air flow. Please follow the installation clearances
shown in the figure. Select the coolest possible place where
intake air temperature is not greater than the outside air
temperature (please refer operating range).
Installation clearances
Obstacle
Return air
Service access
Note:
If there is any obstacle higher than half, of the unit’s
height (H), please allow more space than the figure indicated
in the above table.
Return air
Dischar
ge air
C
D
Dimension
A
B
C
D
Minimum Distance, mm
300
1000
300
500
Obstacle
Obstacle
Obstacle
H/2
H
1-IM-5WMJ(R)-0714(2)DAIKIN(SASO)6 6
1-IM-5WMJ(R)-0714(2)DAIKIN(SASO)6 6
5/22/15 4:27:16 PM
5/22/15 4:27:16 PM
Содержание FTNV20JVAK
Страница 25: ...CVR IM 5WMJ R 0714 2 DAIKIN SA3 3 CVR IM 5WMJ R 0714 2 DAIKIN SA3 3 5 22 15 4 26 07 PM 5 22 15 4 26 07 PM...
Страница 28: ...CVR IM 5WMJ R 0714 2 DAIKIN SA3 3 CVR IM 5WMJ R 0714 2 DAIKIN SA3 3 5 26 15 9 25 35 AM 5 26 15 9 25 35 AM...
Страница 51: ...CVR IM 5WMJ R 0714 2 DAIKIN SA2 2 CVR IM 5WMJ R 0714 2 DAIKIN SA2 2 5 26 15 9 25 35 AM 5 26 15 9 25 35 AM...