![Daikin FTK25JV1NB9 Скачать руководство пользователя страница 129](http://html1.mh-extra.com/html/daikin/ftk25jv1nb9/ftk25jv1nb9_service-manual_2459333129.webp)
For RK25J, RK35J, RX25J, RX35J
Si04-115
120
Removal Procedure
2.3
Removal of PC Board and Switch Box
Procedure
Warning Be sure to turn off all power supplies at least 10 min. before
disassembling work.
Step
Procedure
Points
1. Remove the shelter.
"
The shelter has five hooks.
"
Be sure to avoid forgetting to
restore the shelter and to
avoid loosing or damaging it.
1
Undo the five hooks
and remove the shelter.
2. Remove the printed circuit
board.
1
Disconnect the ground
wire.
Содержание FTK25JV1NB9
Страница 10: ...Si04 115 List of Function 1 Part 1 List of Function 1 Functions 2 1 1 Indoor Unit and Outdoor Unit 2...
Страница 50: ...Si04 115 System Configuration 41 Part 5 System Configuration 1 Instruction 42 1 1 FTK25 35J FTX25 35J 42...
Страница 69: ...Instruction Si04 115 60 System Configuration...
Страница 134: ...Si04 115 For RK25J RK35J RX25J RX35J Removal Procedure 125 2 Slide the MID upward and release Step Procedure Points...
Страница 136: ...Si04 115 For RK25J RK35J RX25J RX35J Removal Procedure 127 4 Remove the fan motor Step Procedure Points...
Страница 145: ...For RK25J RK35J RX25J RX35J Si04 115 136 Removal Procedure...
Страница 146: ...Si04 115 Others 137 Part 8 Others 1 Others 138 1 1 Explanation 138...