16
|
Unit installation
Installer and user reference guide
56
FAA71+100BUV1B
Split system air conditioner
4P654517-1 – 2021.03
A
(mm)
60
85
480
411
1050
104
98
344
389
44
44
103
52
101
290
d
e
c
a
a
a
c
i
a
d
e
b
a
a
a
a
f
f
g
h
B
(mm)
1200
543
503
164
65
186
89
393
459
45
45
80
36
194
340
a
a
a
a
a
a
a
a
i
b
c
c
d
e
d
e
f
f
g
h
A
Pattern for installation with mounting plate for class 71
B
Pattern for installation with mounting plate for class 100
a
Recommended fixing spots
b
Pocket for the pipe port cover
c
Tabs for placing a spirit level
d
Through-the-wall hole Ø80 mm
e
Drain hose position
f
Position for the tape measure at symbol " "
g
Gas pipe end
h
Liquid pipe end
i
Temporary fixing hole
16.3.2 To drill a wall hole
CAUTION
For walls containing a metal frame or a metal board, use a wall embedded pipe and
wall cover in the feed-through hole to prevent possible heat, electrical shock, or fire.
NOTICE
Be sure to seal the gaps around the pipes with sealing material (field supply), in order
to prevent water leakage.
1
Drill a 80 mm large feed-through hole in the wall with a downward slope
towards the outside.
2
Insert a wall embedded pipe into the hole.