6 Electrical installation
Installation manual
23
EL23E
Daikin Altherma 3 R MT F
4P708476-1 – 2023.03
A
Y1
7
B
A
B
7 9
X2M
A4P
Y1
YC
X1M
a
b
a
Installation of EKRP1HBAA (+ mounting plate, see
"6.4 To install the mounting plate"
b
Prewiring between X2M/7+9 and Q1L (= thermal
protector backup heater). Do NOT change.
3
Fix the cable with cable ties to the cable tie mountings.
6.3.7
To connect the space cooling/heating ON/
OFF output
Wires: (2+1)×0.75 mm²
Maximum load: 0.3 A, 250 V AC
—
1
"4.2.1 To open the indoor unit"
1
Top panel
1
2
3
2
User interface panel
3
Upper switch box cover
2
Connect the space cooling/heating ON/OFF output cable to the
appropriate terminals as shown in the illustration below.
7 9
YC
Y2
X2M
1
2
3
A4P
1+2
Wires connected to the space
cooling/heating ON/OFF
output
3
Wire between X2M and A4P
A4P
Installation of EKRP1HBAA is
required.
A
Y2
7
B
A
B
7 9
X2M
A4P
Y2
YC
X1M
a
b
a
Installation of EKRP1HBAA (+ mounting plate, see
"6.4 To install the mounting plate"
27]) is required.
b
Prewiring between X2M/7+9 and Q1L (= thermal
protector backup heater). Do NOT change.
3
Fix the cable with cable ties to the cable tie mountings.
6.3.8
To connect the power consumption digital
inputs
Wires: 2 (per input signal)×0.75 mm²
Power limitation digital inputs: 12 V DC / 12 mA detection
(voltage supplied by PCB)
[9.9]
Power consumption control
.
1
"4.2.1 To open the indoor unit"
12]):
1
Top panel
1
2
3
2
User interface panel
3
Upper switch box cover
2
Connect the power consumption digital inputs cable to the
appropriate terminals as shown in the illustration below.
Содержание ELVZ-E9W
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ...4P708476 1 2023 03 Copyright 2023 Daikin 4P708476 1 0000000U Verantwortung f r Energie und Umwelt...