![Daikin EBHQ011BB6V3 Скачать руководство пользователя страница 4](http://html.mh-extra.com/html/daikin/ebhq011bb6v3/ebhq011bb6v3_installation-manual_502146004.webp)
Installation manual
1
E(D/B)(H/L)Q011~016BB
Unit for air to water heat pump system
4PW67904-1 – 01.2011
C
ONTENTS
Page
1.
Definitions.................................................................................. 2
1.1.
Meaning of warnings and symbols................................................. 2
1.2.
Meaning of used terms .................................................................. 2
2.
General safety precautions........................................................ 2
3.
Introduction................................................................................ 3
3.1.
General information........................................................................ 3
3.2.
Scope of this manual ..................................................................... 4
3.3.
Model identification ........................................................................ 4
3.4.
Typical application examples.......................................................... 4
Application 1 .................................................................................. 4
Application 2 .................................................................................. 5
Application 3 .................................................................................. 6
Application 4 .................................................................................. 6
Application 5 .................................................................................. 7
Application 6 .................................................................................. 9
4.
Accessories ............................................................................. 10
4.1.
Accessories supplied with the unit ............................................... 10
5.
Overview of the unit ................................................................. 10
5.1.
Opening the unit........................................................................... 10
5.2.
Main components......................................................................... 10
Hydraulic compartment (door 3) .................................................. 10
Functional diagram of hydraulic compartment (door 3)................ 11
Switch box main components (door 2)......................................... 11
6.
Installation ............................................................................... 12
6.1.
Selecting an installation location .................................................. 12
General ........................................................................................ 13
Selecting a location in cold climates ............................................ 13
6.2.
Installation servicing space .......................................................... 14
6.3.
Before installation......................................................................... 15
Inspection..................................................................................... 15
Handling ....................................................................................... 15
Opening/closing the unit .............................................................. 15
Accessory check .......................................................................... 15
Important information regarding the refrigerant used................... 16
6.4.
Precautions on installation ........................................................... 16
Foundation work........................................................................... 16
Drain work .................................................................................... 16
Installation method for prevention of falling over .......................... 16
6.5.
Water pipework ............................................................................ 16
Checking the water circuit ............................................................ 16
General precautions concerning water circuit .............................. 17
Checking the water volume and expansion vessel
pre-pressure................................................................................. 17
Setting the pre-pressure of the expansion vessel ........................ 18
Connecting the water circuit......................................................... 18
Protecting the water circuit against freezing ................................ 19
7.
Charging water ........................................................................ 20
8.
Piping insulation ...................................................................... 20
9.
Electrical wiring work ............................................................... 20
9.1.
Precautions on electrical wiring work........................................... 20
9.2.
Internal wiring - Parts table .......................................................... 21
9.3.
System overview of field wiring .................................................... 23
9.4.
Field wiring guidelines.................................................................. 24
9.5.
Precautions on wiring of power supply......................................... 24
Specifications of standard wiring components............................. 24
Connection of the backup heater power supply ........................... 24
Connection of the thermostat cable ............................................. 25
Connection of the valve control cables......................................... 26
Connection to a benefit kWh rate power supply........................... 26
Installation of the digital controller................................................ 28
Wiring specifications .................................................................... 28
10. Start-up and configuration ....................................................... 28
10.1. DIP switch settings overview........................................................ 28
10.2. Room thermostat installation configuration.................................. 29
10.3. Pump operation configuration ...................................................... 29
10.4. Domestic hot water tank installation configuration ....................... 30
10.5. Initial start-up at low outdoor ambient temperatures.................... 30
10.6. Pre-operation checks ................................................................... 30
Checks before initial start-up ....................................................... 30
10.7. Powering up the unit .................................................................... 31
10.8. Setting the pump speed ............................................................... 31
10.9. Failure diagnosis at the moment of first installation ..................... 31
10.10.Field settings ................................................................................ 32
Procedure .................................................................................... 32
Detailed description ..................................................................... 32
10.11.Field settings table ....................................................................... 44
11. Test run and final check ........................................................... 48
11.1. Final check ................................................................................... 48
11.2. Pre-run checks ............................................................................. 48
11.3. Automatic test run ........................................................................ 48
11.4. Test run operation (manual) ......................................................... 48
Procedure .................................................................................... 48
11.5. Underfloor heating screed dry-out program ................................. 49
Disclaimer .................................................................................... 49
Field settings ................................................................................ 49
Getting started ............................................................................. 49
12. Maintenance and service......................................................... 50
13. Troubleshooting........................................................................ 51
13.1. General guidelines ....................................................................... 51
13.2. General symptoms ....................................................................... 51
13.3. Error codes .................................................................................. 53
14. Technical specifications ........................................................... 54
14.1. General ........................................................................................ 54
14.2. Electrical specifications................................................................ 54
The original instructions are written in English. All other languages
are translations of the original instructions.
EDHQ011~016BB6V3
EDHQ011~016BB6W1
EDLQ011~016BB6V3
EDLQ011~016BB6W1
EBHQ011~016BB6V3
EBHQ011~016BB6W1
EBLQ011~016BB6V3
EBLQ011~016BB6W1
Unit for air to water heat pump system
Installation manual
CAREFULLY READ THESE INSTRUCTIONS BEFORE
INSTALLATION. THEY WILL TELL YOU HOW TO INSTALL
AND HOW TO CONFIGURE THE UNIT PROPERLY.
KEEP THIS MANUAL IN A HANDY PLACE FOR FUTURE
REFERENCE.
Содержание EBHQ011BB6V3
Страница 58: ......
Страница 59: ......
Страница 60: ...4PW67904 1 01 2011 Copyright 2011 Daikin ...