- 20 -
B)
Coil Section
1.
No construction debris or foreign material left inside AHU.
Answer:
Yes
No
2.
Is the condensate drain trapped properly?
Answer:
Yes
No
3.
Are pipe connections to coil header correct?
Answer:
Yes
No
4.
Ensure good sealing around the coil header and drain pipe externally.
Answer:
Yes
No
C)
Others
1.
Make sure all dampers in AHU or ducting (if applicable) are in open position.
Answer:
Yes
No
2.
Are filters installed in correct airflow direction?
Answer:
Yes
No
3.
Are the AHU sections joined with section joint properly?
Answer:
Yes
No
4.
Are the joining between AHU sections sealed properly?
Answer:
Yes
No
Start Up Checking
1.
Is fan rotated in correct direction?
Answer:
Yes
No
1.
Voltage that supplied to motor
L1-L2: __________
L2-L3: __________
L3-L1: __________
2.
Motor current drawn per phase
L1: __________
L2: __________
L3: __________
3.
Any abnormal noise?
Answer:
Yes
No
4.
Any abnormal vibration?
Answer:
Yes
No
Value:_______________
5.
Measure and record total static pressure.
Value:_______________
6.
Measure and record airflow.
Value:_______________
7.
Measure and record fan RPM.
Value:_______________
Remark: Please refer IOM for details.