Installation
www.DaikinApplied.com 11
IM 782-12 • DESTINY AIR HANDLERS
Figure 11: Reversing the Coil Handing
Remove screws
from the upper track
that hold coil/drain pan
in place
Position coil/drain pan
assembly in unit and install
screws in upper track.
Lift drain pan connection
up and slide coil/drain pan
assembly out.
Remove screws and
remove coil blockoffs.
Drill holes in coil header plate
flanges, position block offs
and install screws to secure to coil.
Drill holes in coil
bottom flange
and install screws
to secure to
drain pan.
Remove screws
holding coil to
drain pan and
remove coil.
Rotate coil 180°
and reposition in
drain pan.
Mark locations
and drill holes
to align with holes
in upper track.
4
5
6
7
8
3
2
1
9
NOTE:
Rotate a DX
(evaporator)
coil 180° TOP
to BOTTOM.
Distributors
must be on the
leaving air side
of the coil.
NOTE:
If a heating coil
is used, position
heating coil on
the leaving
side of the
cooling coil.
Airflow
Airflow
Airflow
All coils
except DX