English
10
8.
TROUBLESHOOTING
Symptom
Cause and counter
measures
“Pwr Prp Dist” is not displayed.
Power Proportional Distribu-
tion function is not set yet.
Contact your supplier.
When power proportional distribu-
tion calculation is carried out, the
following message is displayed.
There is a time zone when
power proportional distribu-
tion calculation is not made in
the designated collection
period. The cause for non
availability of power propor-
tional distribution calculation
can be power failure.
Press OK button to continue
collection.
∗
Collection is made by other
period excluding the day.
When Power Proportional Distri-
bution Report is to be saved into a
file, “No memory card” is dis-
played.
PCMCIA card is not inserted
correctly into the intelligent
Touch Controller.
Check whether PCMCIA card
is inserted, and whether it is
inserted correctly or not.
I can’t display electric power
amount in unit of tenant.
When electric power propor-
tional distribution is carried
out by the intelligent Touch
Controller mainframe, electric
power amount is displayed in
unit of air conditioner or in unit
of zone.
To display electric power
amount in unit of tenant, edit
the data of CSV format saved
in PCMCIA card by use of
your general purpose table
calculation software.
How do I convert electric power
amount into charges?
It is not available to convert
electric power amount into
charges by the intelligent
Touch Controller. To convert
electric power amount into
charges, edit the data of CSV
format saved in PCMCIA card
by use of your general pur-
pose table calculation soft-
ware.
How to print out Power Propor-
tional Distribution Report?
The intelligent Touch Control-
ler does not have printing
function. To print out Power
Proportional Distribution
Report, print out the data of
CSV format saved in PCM-
CIA card by use of your per-
sonal computer and printer.
Symptom
Cause and counter
measures
How to change zone registration? To change zone registration
for change of insertion and so
forth in the middle of month,
read out once Power Propor-
tional Distribution Report for
the days to the previous day
of change.
(By period designation, it is
possible to designate and
read an optional period.)
For the month with change,
read the reports for days
before change and those for
days after change.
Exclusion Periods (Normal Type)
setup and Special Calculation
Days (Normal Type) setup
Exclusion Periods (Normal
Type) setup and Special Cal-
culation Days (Normal Type)
setup are not to be set when
to carry out power propor-
tional distribution of ice stor-
age type.
And setting is for only one
pattern, and it is not available
to make different setting per
zone.
Electric power amount at stop-
page
“Electric power amount at
stoppage” in the display of
Power Proportional Distribu-
tion Report is the total value
of electric power amount
when it is set not to propor-
tionally distribute electric
power of crank case heater
consumed at stoppage of air
conditioner since the electric
power amount cannot be
divided to any air conditioner.
The electric power amount in
this case must be handled as
common service fees and so
forth.
“Time Zone Setup” is not dis-
played.
“Time Zone Setup” can be
displayed in SE Mode. Con-
tact your supplier.
When the S button is presed,
“Password for administrator” is
displayed.
Confirm your administrator to
enter the password.
01_EM06A043_EN.fm Page 10 Monday, October 16, 2006 11:25 AM
Содержание DCS002A71
Страница 13: ......
Страница 14: ......
Страница 15: ......
Страница 16: ...0609 HT EM06A043 00_CV_EM06A043 fm Page 2 Tuesday September 12 2006 1 27 PM...