![Daikin AZAS100M7V1B Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/daikin/azas100m7v1b/azas100m7v1b_installers-reference-manual_2460431027.webp)
12 Technical data
Installer reference guide
27
AZAS71~Y1
Sky Air Active-series
4P486048-1A – 2017.08
Multiple rows of units (
)
b (mm)
≥1000
≥200
≥2000
≥100
≥3000
≥1500
b
≥100
≥100
≥100
≥100
≥250
≥250
H
B
H
U
H
B
≤½H
U
b≥250
½H
U
<H
B
≤H
U
b≥300
H
B
>H
U
H
B
H
U
Stacked units (max. 2 levels) (
)
A1
A2
≥500
≥1000
A2
≥500
≥300
≥100
≥100
B1
A2
B2
≥100
≥300
≥100
≥100
B2
≥100
≥1000
B2
A1=>A2
(A1) If there is danger of drainage dripping and freezing between the upper and lower units…
(A2) Then install a
roof
between the upper and lower units. Install the upper unit high enough above the lower unit to prevent ice buildup at the
upper unit's bottom plate.
B1=>B2
(B1) If there is no danger of drainage dripping and freezing between the upper and lower units…
(B2) Then it is not required to install a roof, but
seal the gap
between the upper and lower units to prevent discharged air from flowing back to the
suction side through the bottom of the unit.
12.3
Piping diagram: Outdoor unit
LPS
HPS
sv
A
B
Charge port / Service port (with 5/16" flare)
Stop valve
Filter
Check valve
Pressure relief valve
Solenoid valve
Heat sink (PCB)
Capillary tube
Electronic expansion valve
4‑way valve
High pressure switch
LPS
Low pressure switch
Compressor accumulator
Heat exchanger
Содержание AZAS100M7V1B
Страница 30: ......
Страница 31: ......
Страница 32: ...4P486048 1A 2017 08 Copyright 2017 Daikin...