![Daikin ATXP20L5V1B Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/daikin/atxp20l5v1b/atxp20l5v1b_installation-manual_501398007.webp)
5 Installation
Installation manual
7
(A)(F)TXP20~3 FTXF20~3 FTXF20~25B5V1B
Daikin room air conditioner
3P519299-1H – 2019.09
a
Front panel shaft
To re-install the front panel
1
Attach the front panel. Align the shafts with the slots and push
them all the way in.
2
Close the front panel slowly; press at both sides and at the
centre.
To remove the front grille
CAUTION
Wear adequate personal protective equipment (protective
gloves, safety glasses,…) when installing, maintaining or
servicing the system.
1
Remove the front panel to remove the air filter.
2
Remove 2 screws from the front grille.
3
Push down the 3 upper hooks marked with a symbol with 3
circles.
a
b
a
a
Upper hook
b
Symbol with 3 circles
4
We recommend opening the flap before removing the front
grille.
5
Place both hands under the centre of the front grille, push it up
and then toward you.
1
2
To re-install the front grille
1
Install the front grille and firmly engage the 3 upper hooks.
2
Install 2 screws (class 20~35) back on the front grille.
3
Install the air filter and then mount the front panel.
To remove the electrical wiring box cover
1
Remove the front grille.
2
Remove 1 screw from the electrical wiring box.
3
Open the electrical wiring box cover by pulling the protruding
part on the top of the cover.
4
Unhook the tab on the bottom and remove the electrical wiring
box cover.
a
a
c
b
a
1
3
2
a
Tab
b
Protruding part on the top of the cover
c
Screw
5
To re-install the cover, first hook the bottom tab onto the
electrical wiring box, and slide the cover into the 2 upper tabs.
To open the service cover
1
Remove 1 screw from the service cover.
2
Pull out the service cover horizontally away from the unit.
a
b
a
Service cover screw
b
Service cover
5.2
Installing the indoor unit
5.2.1
To install the mounting plate
1
Install the mounting plate temporarily.
2
Level the mounting plate.
3
Mark the centres of the drilling points on the wall using a tape
measure. Position the end of tape measure at symbol " ".
4
Finish the installation by securing the mounting plate on the wall
using M4×25L screws (field supply).
INFORMATION
The removed pipe port cover can be kept in the mounting
plate pocket.