
English
7
Outdoor Unit Installation
6.
Refilling the refrigerant.
Check the type of refrigerant to be used on the machine nameplate.
Precautions when adding R410A
Fill from the liquid pipe in liquid form.
It is a mixed refrigerant, so adding it in gas form may cause the refrigerant composition to change, preventing normal operation.
1) Before filling, check whether the cylinder has a siphon attached or not. (It should have something like “liquid filling siphon
attached” displayed on it.)
• Be sure to use the R410A tools to ensure pressure and to prevent foreign objects entering.
7.
Refrigerant piping work.
7-1 Cautions on pipe handling.
1) Protect the open end of the pipe against dust and moisture.
2) All pipe bends should be as gentle as possible. Use a pipe bender
for bending.
7-2 Selection of copper and heat insulation materials.
When using commercial copper pipes and fittings, observe the following:
1) Insulation material: Polyethylene foam
Heat transfer rate: 0.041 to 0.052W/mK (0.035 to 0.045kcal/(mh •°C))
Refrigerant gas pipe’s surface temperature reaches 110°C max.
Choose heat insulation materials that will withstand this temperature.
2) Be sure to insulate both the gas and liquid piping and to provide insulation
dimensions as below.
3) Use separate thermal insulation for gas and liquid refrigerant pipes.
Gas side
Liquid side
Gas pipe
thermal insulation
Liquid pipe
thermal insulation
O.D. 9.5mm
O.D. 6.4mm
I.D. 12-15mm
I.D. 8-10mm
Minimum bend radius
Thickness 10mm Min.
30mm or more
Thickness 0.8mm (C1220T-O)
Filling a cylinder with an attached siphon
Stand the cylinder upright when
filling.
There is a siphon pipe inside, so the
cylinder need not be upside-down to
fill with liquid.
Filling other cylinders
Turn the cylinder upside-down
when filling.
W
all
If no flare cap is
a
v
aila
b
le, co
v
er
the flare mo
u
th
w
ith tape to keep
dirt or
w
ater o
u
t.
Be s
u
re to
place a cap.
Rain
Gas pipe
Liquid pipe
Gas pipe
insulation
Liquid pipe
insulation
Finishing tape
Drain hose
Inter-unit wiring
3P291651-9U.book Page 7 Thursday, November 27, 2014 2:45 PM
d
c
b
a
e
f
2
NOTICE
2
Fix the label on the unit according to the instructions in the manual.
2
To fix the fluorinated greenhouse gases label
1
Fill in the label as shown in the illustration.
a
If a multilingual fluorinated greenhouse gases label is delivered with the unit (see
accessories), peel off the applicable language and stick it on top of
a.
b
Factory refrigerant charge: see unit name plate
c
Additional refrigerant amount charged
d
Total refrigerant charge
e
Greenhouse gas emissions
of the total refrigerant charge expressed as tonnes CO
equivalent
f
GWP = Global warming potential
In Europe, the
greenhouse gas emissions
of the total refrigerant charge in the system (expressed as tonnes CO -equivalent) is used to
determine the maintenance intervals. Follow the applicable legislation.
Formula to calculate the greenhouse gas emissions:
GWP value of the refrigerant × Total refrigerant charge [in kg] / 1000
Use the GWP value mentioned on the greenhouse gases label. This GWP value is based on the 4th IPCC Assessment Report. The GWP
value mentioned in the manual might be outdated (i.e., based on the 3rd IPCC Assessment Report).