General

Select an installation site where the following conditions are
satisfied and that meets with your customer's approval.
-

Places which are well-ventilated.

-

Places where the unit does not bother next-door neighbours.

-

Safe places which can withstand the unit's weight and 
vibration and where the unit can be installed level.

-

Places where there is no possibility of flammable gas or 
product leak.

-

The equipment is not intended for use in a potentially 
explosive atmosphere.

-

Places where servicing space can be well ensured.

-

Places where the indoor and outdoor units' piping and wiring 
lengths come within the allowable ranges.

-

Places where water leaking from the unit cannot cause 
damage to the location (e.g. in case of a blocked drain pipe).

-

Places where the rain can be avoided as much as possible.

-

Do not install the unit in places often used as work place.
In case of construction works (e.g. grinding works) where a
lot of dust is created, the unit must be covered.

-

Do not place any objects or equipment on top of the unit (top 
plate).

-

Do not climb, sit or stand on top of the unit,

-

Be sure that sufficient precautions are taken, in accordance 
with applicable legislation, in case of refrigerant leakage.

When installing the unit in a place exposed to strong wind, pay
special attention to the following.
Strong winds of 5 m/sec or more blowing against the outdoor
unit's air outlet causes short circuit (suction of discharge air),
and this may have the following consequences:
-

Deterioration of the operational capacity.

-

Frequent frost acceleration in heating operation.

-

Disruption of operation due to rise of high pressure.

-

When a strong wind blows continuously on the face of the 
unit, the fan can start rotating very fast until it breaks.

Refer to the figures for installation of this unit in a place where
the wind direction can be foreseen.

Install a baffle plate on the air suction side of the outdoor unit
and set the outlet side at a right angle to the direction of the
wind:

Prepare a water drainage channel around the foundation, to
drain waste water from around the unit.

If the water drainage of the unit is not easy, please build up the
unit on a foundation of concrete blocks, etc. (the height of the
foundation should be maximum 150 mm).

If you install the unit on a frame, please install a waterproof plate
within 150 mm of the underside of the unit in order to prevent the
invasion of water from the lower direction.

When installing the unit in a place frequently exposed to snow,
pay special attention to elevate the foundation as high as
possible.

If you install the unit on a building frame,
please install a waterproof plate (field
supply)(within 150 mm of the underside of
the unit) or use a drain kit (refer to
combination table in 

"Possible options" on

page 5

) in order to avoid the drainwater

dripping. (See figure).

Make sure that the unit is installed level.

CAUTION

Make sure to provide for adequate measures in order
to prevent that the outdoor unit be used as a shelter
by small animals.

Small animals making contact with electrical parts can
cause malfunctions, smoke or fire. Please instruct the
customer to keep the area around the unit clean.

1

Baffle plate

2

Strong wind

3

Discharge air

1

2

3

2

Содержание altherma ERHQ014BAV3

Страница 1: ...STALLATION MANUAL ERHQ011BAV3 ERHQ014BAV3 ERHQ016BAV3 ERHQ011BAW1 ERHQ014BAW1 ERHQ016BAW1 ERLQ011CAV3 ERLQ014CAV3 ERLQ016CAV3 ERLQ011CAW1 ERLQ014CAW1 ERLQ016CAW1 Outdoor unit for air to water heat pum...

Страница 2: ...150 500 500 500 500 750 100 100 100 100 200 200 200 300 300 300 300 250 300 250 300 1000 1000 1000 1000 1000 1000 1000 1000 1000 1250 1500 1500 1000 100 250 500 1000 1000 1000 500 500 500 500 500 500...

Страница 3: ...le prescrizioni per 07 v v v 08 de acordo com o previsto em 09 10 under iagttagelse af bestemmelserne i 11 enligt villkoren i 12 gitt i henhold til bestemmelsene i 13 noudattaen m r yksi 14 za dodr e...

Страница 4: ...nal refrigerant charge for ERLQ models 18 12 5 Complete recharging 19 For ERHQ only 19 For ERLQ only 19 13 Pump down operation 19 14 Electrical wiring work 19 14 1 Precautions on electrical wiring wor...

Страница 5: ...ctivities described in this manual shall be carried out by an installer Be sure to wear adequate personal protection equipment protection gloves safety glasses when performing installation maintenance...

Страница 6: ...r the refrigerant after the pump down operation Refer to chapter 13 Pump down operation on page 19 Never directly touch any accidental leaking refrigerant This could result in severe wounds caused by...

Страница 7: ...pecial equipment insulation bottom plate heater to ensure good operation in areas where low ambient temperature can occur together with high humidity conditions In such conditions the ERHQ models may...

Страница 8: ...t ERLQ Standard a a Factory mounted Not applicable c c No drain socket available for ERLQ ERHQ Optional kit b b Combination of both options is prohibited Optional kit b Snow cover Demand pcb ERLQ EK01...

Страница 9: ...nd power supply 3 Reactor coil s 13 Gas stop valve 4 4 way valve 14 Liquid stop valve 5 Noise filter pcb only for V3 models 15 Electronic expansion valve main 6 Service pcb only for V3 models 16 Solen...

Страница 10: ...1HC S1NPH S1PH W1 R1T R4T R5T 1 Indoor unit EKHBH X016 14 Stop valve with service port 5 16 2 Outdoor unit 15 Crank case heater 3 Heat exchanger 16 Fan motor 4 Service port 5 16 17 Injection valve 5 C...

Страница 11: ...door unit 16 Fan motor 3 Heat exchanger 17 Electronic expansion valve injection 4 Service port 5 16 18 Capillary tube 5 Compressor 19 Solenoid valve hot gas pass 6 Accumulator R1T Thermistor air 7 Pre...

Страница 12: ...and this may have the following consequences Deterioration of the operational capacity Frequent frost acceleration in heating operation Disruption of operation due to rise of high pressure When a stro...

Страница 13: ...tion site where the snow will not affect the unit and set the outlet side at a right angle to the direction of the wind For ERLQ only Follow the procedure as described below for modifying the position...

Страница 14: ...ERHQ Check in the combination table under Possible options on page 5 whether drain work is allowed In case drain work on your unit is allowed and the installation site requires drain work then follow...

Страница 15: ...for laying the upper outdoor unit s drain pipe Get the portion A sealed so that air from the outlet does not bypass C In case of multiple row installation for roof top use etc for ERHQ only 1 In case...

Страница 16: ...rts shall comply with the applicable legislation and shall be suitable for refrigerant Use phosphoric acid deoxidised seamless copper for refrigerant Installation shall be done by a licensed refrigera...

Страница 17: ...her When connecting the piping always use a spanner and torque wrench together to tighten the flare nut to prevent flare nut cracking and leaks Not recommended but in case of emergency Should you be f...

Страница 18: ...ed where indicated by the arrow Take care not to damage it After handling the stop valve make sure to tighten the stem cap securely For the tightening torque refer to the table below Check for refrige...

Страница 19: ...stop valve can move to the indoor unit To avoid this please cover the stop valve with sealing material If the temperature is higher than 30 C and the humidity is higher than RH 80 then the thickness...

Страница 20: ...The stop valves can now be opened and or additional refrigerant can be charged see 12 Charging refrigerant on page 17 12 CHARGING REFRIGERANT 12 1 Important information regarding the refrigerant used...

Страница 21: ...tional amount of refrigerant to be charged using the table below Table 1 Additional charging of refrigerant unit kg For W1 models It is not necessary to charge additionally if the piping length is und...

Страница 22: ...unit wiring on page 20 so that it does not come in contact with the piping particularly on the high pressure side Make sure no external pressure is applied to the terminal connectors When installing t...

Страница 23: ...in properly 14 3 Precautions on wiring of power supply and inter unit wiring Use a round crimp style terminal for connection to the power supply terminal board In case it cannot be used due to unavoid...

Страница 24: ...ntroller ERHQ_V3 ERLQ_V3 ERHQ_W1 ERLQ_W1 Phase and frequency 1 50 Hz 3N 50 Hz Voltage 230 V 400 V Recommended field fuse 32 A 40 A 20 A Minimum circuit amps a a Stated values are maximum values see el...

Страница 25: ...al operation of the unit a number of checks and inspections should be carried out on the unit at regular intervals preferably yearly This maintenance shall be carried out by the installer or service a...

Страница 26: ...Painted galvanised steel Dimensions h x w x d mm 1170 x 900 x 320 1345 x 900 x 320 Weight kg 103 108 114 114 Operation range cooling min max C 10 46 heating min max C 20 a 35 a See operation range dat...

Страница 27: ...ransmission circuit for V3 models only V1R Power module for V3 models only V1R V2R Power module for W1 models only V2R V3R Diode module for V3 models only V3R Diode module for W1 models only V1T Insul...

Страница 28: ...NOTES NOTES...

Страница 29: ...NOTES NOTES...

Страница 30: ...NOTES NOTES...

Страница 31: ...5 6 1 2 3 16 16a V3 type 1 50 Hz 230 V R410A 1 2 4 5 6 3 W1 type 3N 50 Hz 400 V L1 L3 L2 L1 L3 L2 5 6 NOTES...

Страница 32: ...4PW57794 1 08 2010 Copyright 2010 Daikin...

Отзывы: