ESIE06-03
Outdoor Unit Functional Concept
Part 2 – Functional Description
2–19
3
2
4
5
1
3.7
Heating Peak-cut Control
Outline
Heat pump only
During heating operation, the signals being sent from the hydro-box allow the operating frequency
limitation and prevent abnormal high pressure (the signal from the hydro-box must be divided as
follows).
Conditions for start
controlling
Judge the controlling start with the indoor heat exchanger temperature after 5 sec from operation start.
Control in each
zone
The heat exchange intermediate temperature of hydro-box controls the following.
Heat exchanger
thermistor temperature
Return / Reset zone
Up zone
Keep zone
Drooping zone
Stop zone
Содержание Altherma EKHBH Series
Страница 2: ...ESIE06 03 1 2 Part 1 System Outline 3 1 1 5 ...
Страница 26: ...Functional Diagrams ESIE06 03 1 26 Part 1 System Outline 3 1 1 4 5 ...
Страница 32: ...Piping Diagrams ESIE06 03 1 32 Part 1 System Outline 3 1 1 4 5 ...
Страница 38: ...Switch Box Layout ESIE06 03 1 38 Part 1 System Outline 3 1 1 4 5 ...
Страница 58: ...PCB Layout ESIE06 03 1 58 Part 1 System Outline 3 1 1 4 5 ...
Страница 60: ...ESIE06 03 2 2 Part 2 Functional Description 3 1 2 5 ...
Страница 68: ...Hydro box Functional Concept ESIE06 03 2 10 Part 2 Functional Description 3 1 2 4 5 ...
Страница 88: ...ESIE06 03 3 2 Part 3 Troubleshooting 3 1 3 5 ...
Страница 134: ...Error Codes System Malfunctions ESIE06 03 3 48 Part 3 Troubleshooting 3 1 3 4 5 ...
Страница 152: ...Additional Checks for Troubleshooting ESIE06 03 3 66 Part 3 Troubleshooting 3 1 3 4 5 ...
Страница 154: ...ESIE06 03 5 2 Part 5 Disassembly and Maintenance 3 1 5 ...
Страница 180: ...Removal procedure outdoor unit ERYQ005 007AAV3 ESIE06 03 5 28 Part 5 Disassembly and Maintenance 3 1 5 5 ...