WARNING!
This equipment must only be used by
children
aged 8 and above and by persons with re-
stricted physical, sensory or mental capabilities
or with a lack of experience and knowledge, if
they are under supervision or if they have been
instructed in the safe use of the equipment and
understand the dangers arising therefrom.
Children
must not play with the equipment.
Cleaning or
user maintenance
must not be
carried out by
children
without supervision.
2
x
Safety
Daikin Altherma M ECH
2
O
Solar storage tank with heating controller
008.1446799_00 – 07/2019 – EN
Installation and maintenance instructions
5
2.3 Intended use
Indoor unit
Outdoor unit
Heating and cooling (X)
EKHWMX300C
EBLQ05C2V3
EBLQ07C2V3
EKHWMXB300C
EKHWMX500C
EKHWMXB500C
The Daikin Altherma M ECH
2
O must only be
used to prepare hot water, as a room heating
system and as a room cooling system.
The Daikin Altherma M ECH
2
O must only be in-
stalled, connected and operated according to the
data in these instructions.
Only the use of a suitable outdoor unit approved
by Daikin is permitted. The following combina-
tions are permissible in this respect:
Tab.
2-1 Permissible combinations of Daikin Altherma M ECH
2
O solar
storage tanks with heating controller and Daikin Altherma M
ECH
2
O outdoor units
Any other use outside the intended use is con-
sidered as improper. The operator alone shall
bear responsibility for any resulting damage.
Intended use also includes compliance with the
maintenance and service conditions. Re-
placement parts must at least satisfy the tech-
nical requirements defined by the manufacturer.
This is the case, for
example, with original spare
parts.
2.4 Instructions for operating safety
2.4.1 Before working on the hydraulic system
●
Work on the Daikin Altherma M ECH
2
O (such
as e.g. installation, connection and initial
commissioning) must only be carried out by
persons who are authorised, who have
successfully completed qualifying technical or
vocational training for the respective activity
and who have taken part in advanced training
sessions recognised by the relevant respon-
sible authority. This, in particular, includes
heating specialists and climate control techni-
cians who have experience, as a result of their
technical training and their knowledge of the
subject, of proper and appropriate installation
and maintenance of heating, climate control
and cooling installations and heat pumps.
●
Switch off the external main switch during all
work on the Daikin Altherma M ECH
2
O, and
secure it to prevent unintentional activation.
●
Seals must not be damaged or removed.
●
Make sure that the safety valves comply with
the requirements of EN
12828
when
connecting on the heating side, and with the
requirements of EN
12897 when connecting
on the domestic water side.
●
Only original Daikin replacement parts may be
used.
●
When working on the hydraulics, you must
first drain the water or release the pressure
using the internal KFE valve. Otherwise hot
water can jet out under pressure and result in
injury.
2.4.2 Electrical installation
●
Electrical installation must only be carried out
by specialist personnel with electrical
engineering qualifications and subject to
compliance with the valid electrical
engineering guidelines as well as the regula-
tions of the responsible utility company (EVU).
●
Compare the mains voltage (~230
V,
50
Hz
or
~400
V,
50
Hz) indicated on the type plate
with the supply voltage before connecting to
the mains.
●
Before beginning work on live parts,
disconnect all of the systems circuits from the
power supply (switch off main switch,
disconnect fuse) and secure against uninten-
tional restart.
●
Equipment covers and service panels must be
replaced as soon as the work is completed.
Содержание Altherma EBLQ05C2V3
Страница 68: ...008 1446799_00 07 2019 EN Copyright Daikin ...