7
|
Installation
Installer reference guide
83
C08AF + EHYKOMB33A
Daikin Altherma R Hybrid
4P471761-1E – 2020.10
4C From the top
a
b
PCB
b
1×
4D From the top centre
a
PCB
b
b
1×
a
Notch this part for the wiring to pass through with nippers etc.
b
Secure the wiring to the front part of the casing using the wiring
retainer and clamp.
7.10.9 To connect the shut-off valve
1
Connect the valve control cable to the appropriate terminals as shown in the
illustration below.
NOTICE
Wiring is different for a NC (normally closed) valve and a NO (normally open) valve.
X2M
X1M
7
5
6
X5M
X2M
X1M
X5M
NO
NC
M2S
M2S
7
6
5
2
Fix the cable with cable ties to the cable tie mountings.
7.10.10 To connect the domestic hot water pump
1
Connect the domestic hot water pump cable to the appropriate terminals as
shown in the illustration below.