3 Set-up and installation
Installation and operating manual
29
Daikin Altherma EHS(X/H)(B)-D
Daikin Altherma 3 R ECH
₂
O
008.1451099_00 – 07/2020
3.9
Filling the system
Only fill the indoor unit after all installation work is completed in the
order shown below.
3.9.1
Checking the water quality and adjusting
the manometer
1
Comply with the instructions for the water connection
(see
19]) and for the water quality.
2
Adjust the mechanical manometer (mounted on site in
accordance with
"3.6.2 Connecting hydraulic lines"
19] or
temporarily installed with filling hose): Turn the pressure gauge
glass so that the minimum pressure marking corresponds to the
system height +2 m
(1 m water column corresponds to
0.1 bar).
3.9.2
Filling hot water heat exchangers
1
Open the shut-off valve for the cold water supply pipe.
2
Open the hot water tap connections so that the draw-off volume
can be set as high as possible.
3
Once water has been discharged from the tap connections, do
not interrupt the cold water flow to ensure that the heat
exchanger will be fully vented and that any impurities or residue
will be discharged.
3.9.3
Filling the storage tank
Without installed
solar system
1
Connect the
charge hose
with non-return valve (1/2")
to
the
"Solar flow" connection
(item a).
2
Fill
the storage tank of the indoor unit
until water
emerges at
the
overflow connection
(item b).
3
Disconnect the charge hose with backflow prevention (1/2")
again.
With installed
solar system
1
Install the filling connection with combined filling and draining
valve (accessory
combined filling and draining BA
) following
the solar control and pump unit (EKSRPS4).
2
Connect the
charge hose
with non-return valve (1/2") to the
previously installed combined filling and draining valve.
3
Fill
the storage tank of the indoor unit
until water
emerges at
the
overflow connection
(item b).
4
Disconnect the charge hose with backflow prevention (1/2")
again.
3‒45 Filling the buffer tank - without connected DrainBack solar
system
a
Solar flow
b
Safety overflow
3.9.4
Filling the heating system
DANGER: RISK OF ELECTROCUTION
During the filling process, water may escape from any
leaking points that can cause an electric shock if it comes
into contact with live parts.
▪ Before the filling process, de-energise the indoor unit.
▪ After the first filling and before switching on the indoor
unit at the mains switch, check that all electric parts
and connection points are dry.
INFORMATION
Comply with the instructions for the water connection (see
19]) and water quality (see