9
|
Electrical installation
Installer reference guide
107
EPRA08~W1 + ETSH/X(B)12P30+50EF
Daikin Altherma 3 H MT ECH₂O
4P663478-1 – 2021.07
9.2.1 To connect the electrical wiring to the outdoor unit
1
Open the switch box cover. See
"7.2.2 To open the outdoor unit"
71].
2
Strip insulation (20 mm) from the wires.
a
b
a
Strip wire end to this point
b
An excessive strip length may cause electrical shock or leakage
3
Insert the cables at the back of the unit, and route them through the factory-
mounted cable sleeves into the switch box.
d
c2
b2
c1
b1
a1
a2
a1+a2
Power supply cable (field supply)
b1+b2
Interconnection cable (field supply)
c1+c2
(optional) Drain tube heater cable (field supply)
d
Cable sleeves (factory-mounted)
4
Inside the switch box, connect the wires to the appropriate terminals, and fix
the cables with cable ties. See:
▪
▪
In case of V3 models
1
Power supply cable
:
▪
Route the cable through the frame.
▪
Connect the wires to the terminal block.
▪
Fix the cable with a cable tie.
Wires: 1N+GND
Maximum running current: Refer to name plate on unit.
—
Содержание Altherma 3 H MT ECH2O
Страница 301: ......
Страница 302: ......
Страница 303: ......
Страница 304: ...4P663478 1 2021 07 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...