
5
|
Application guidelines
Installer reference guide
36
EPRA14~W1 + ET9W
Daikin Altherma 3 H HT F
4P587503-1A – 2020.01
▪
Requires external power meters.
▪
Setup and configuration: When using electrical power meters, set the number of
pulses/kWh for each power meter via the user interface.
INFORMATION
When measuring the electrical power consumption, make sure ALL power input of
the system is covered by the electrical power meters.
5.4.3 Normal kWh rate power supply
General rule
One power meter that covers the entire system is sufficient.
Setup
Connect the power meter to X5M/5 and X5M/6. See
Power meter type
In case of…
Use a… power meter
▪
Single-phase outdoor unit
▪
Backup heater supplied from a single-
phase grid (i.e. the backup heater
model is *6V connected to a single-
phase grid).
Single-phase
(*6V (6V): 1N~ 230 V)
▪
Three-phase outdoor unit
▪
Backup heater supplied from a three-
phase grid (i.e. the backup heater
model is *9W or *6V connected to a
three-phase grid).
Three-phase
(*6V (6T1): 3~ 230 V)
(*9W: 3N~ 400 V)
Содержание Altherma 3 H HT EPRA18DAW1
Страница 250: ......
Страница 251: ......
Страница 252: ...4P587503 1A 2020 01 Copyright 2019 Daikin Verantwortung f r Energie und Umwelt...