6
|
Unit installation
Installer reference guide
54
EPRA14~W1 + ETVH/9W(G)
Daikin Altherma 3 H HT F
4P587502-1B – 2020.12
6 Unit installation
In this chapter
6.1 Preparing the installation site
Do NOT install the unit in places often used as work place. In case of construction
works (e.g. grinding works) where a lot of dust is created, the unit MUST be
covered.
Choose an installation location with sufficient space for carrying the unit in and out
of the site.
WARNING
The appliance shall be stored in a room without continuously operating ignition
sources (example: open flames, an operating gas appliance or an operating electric
heater).
6.1.1 Installation site requirements of the outdoor unit
INFORMATION
Also read the precautions and requirements in the
Mind the spacing guidelines. See
"15.1 Service space: Outdoor unit"
NOTICE
▪
Do NOT stack the units on each other.
▪
Do NOT hang the unit on a ceiling.
Содержание Altherma 3 H HT EPRA18DAV3
Страница 259: ......
Страница 260: ...4P587502 1B 2020 12 Copyright 2019 Daikin Verantwortung f r Energie und Umwelt...