9.1

 

Assembly of heat wheel 

 

1. Heat wheel unit bottom section has already assembled with heat wheel support assembly 
and heat wheel baffle bottom when delivered.  

 

2. Placed the baffle centre to the penta-post / centre-post or panel.  

 

3.  Placed  the  heat  wheel  on  the  heat  wheel  support  assembly  in  the  bottom  section  from 

opening on top/side, depends on the design. 

 

4. Screw the heat wheel to the heat wheel support assy. by using self-drilling screws. 

 

5. screwed the heat wheel baffle left/right and centre 

 

6. Assemble the top cabinet section to the bottom section. If required, remove some panel to 
facilitate assembly work of heat wheel.  Screw the baffle left/right and centre to top section 
cabinet. 

 

7. Assemble the heat wheel baffle top. 

 

8. Assembled back the remaining panels.  

 
 
9.2

 

   AHU Water Quality 

 
Water quality requirements: Water softening treatment must be given in advance to prevent 

scaling  in  the  heat  exchanger  which  may  affect  heat  exchange  effect.  Moreover,  water 
without  softening treatment may  form  scale in the pipe to increase water  resistance which 
will affect water flow and pump work efficiency. 

 

Table 6 – Water Quality Requirements 

Item 

Baseline 

Value 

Tendency 

Corrosion  Scaling 

Benchmark 

items 

pH (25°C) 

7.5 ~ 9.0 

Conductivity (25°C) 

µS / cm 

<800 

Chloride Ion Cl

-

 

mg (Cl

-

)

 

/ L 

<200 

 

Sulfate Ion SO

4

2-

 

mg(SO

4

2-

) / L 

<200 

 

Acid Consumption (pH=4.8)  mg(CaCO

3

) / L 

<100 

 

Total Harness 

mg(CaCO

3

) / L 

<200 

 

Reference 

items 

Ferrum Fe 

mg(Fe) / L 

<1.0 

Sulphion S

2-

 

mg(S

2-

) / L 

 

Ammonium Ion NH

4

+

 

mg(NH

4

+

) / L 

<1.0 

 

Silicon Oxide SiO

2

 

mg(SiO

2

) / L 

<50 

 

Note : O - factor related to the tendency of corrosion or scaling 

 
 

9.3

 

     AHU Commissioning Check Sheet 

 

 

 

 

 

Содержание AHUR VRV AHU

Страница 1: ...LATION OPERATION MAINTENANCE VER O AHU01 DEC20 15 The design and construction are subject to change without any notice for future improvement MODELS DM AHU DS AHU AHUR VRV AHU Double Skin Modular Air...

Страница 2: ...rtificate which is determined by International National or Local Codes and Regulation Place of service should be equipped with the necessary protective equipment which provide safe maintenance 1 4 Uni...

Страница 3: ...truck 4 Storage For external storage prior to installation the units must be protected from dust rain constant sun exposure and rodents Although covered in shrink wrapped plastic sheeting this is not...

Страница 4: ...carefully assembled to desired unit arrangement The air handling units are design to use section joint brackets to combine two sections Section joints for cabinet and base frame are shown in Figure 5...

Страница 5: ...on joint WARNING CABINET SECTION JOINTS ARE NOT INTENDED FOR LIFTING PURPOSE AND PULLING CABINET FROM A DISTANCE TO JOIN SECTION TOGETHER When the cabinets are penta post to penta post arrangement or...

Страница 6: ...hipped out from factory See Figure 15 Figure 14 Restrained Spring Isolator Figure 15 Removing of U Shaped Plate 5 5 Arrangement VRV AHU Control box and expansion valve kit are installed on the air han...

Страница 7: ...joints or flexible fittings are to be provided in all piping connections particularly those adjacent to heating source to absorb expansion and contraction strains Failure to comply will result in dama...

Страница 8: ...valve and not to a common header When two or more coils are connected to a common suction line never place the bulb on the common line Thermostatic expansion valve is to be equipped with external equa...

Страница 9: ...r control refer to the VFD manual for wire size and requirements Figure 22 3 phases motor connection diagram 5 7 2 Motor Cabling Motor wiring must go downward from motor terminal box to prevent conden...

Страница 10: ...he diameter of smaller pulley Table 2 Adjusted Pitch Diameter Model VPT100Z1 VPT120A1 A2 VPT139A1 A2 VPT156A1 A2 VPT177A1 A2 VPT178B2 Max Pitch mm 96 114 4 133 4 150 4 171 4 171 Min Pitch mm 82 9 96 1...

Страница 11: ...ee Table 2 Figure 27 When the required diameter is obtained adjustable flange is locked by tighten the four clamp screws To get the same diameter in the two grooves of pulleys screw the two mobile fla...

Страница 12: ...out Notes 1 Elbows should not be closer than 2 1 2 times the Duct Equivalent Diameter Refer to Formula 1 2 Dampers should be placed at least fan diameters downstream of the fan discharge Formula 1 Duc...

Страница 13: ...ther For DX coils it is advisable that the refrigerant is to be pumped into the condenser If this is not possible refrigerant shall be purged out WARNING DO NOT HEAT ANY PART ON DX COIL IF REFRIGERANT...

Страница 14: ...20mm 6 1 5 Coils Check the pipe work to coil is correctly connected and the fins are free from foreign matter or damage Check that the condensate drain is trap Ensure good sealing of silicon around th...

Страница 15: ...or cap screw are in secure position CAUTION HIGH AIR TEMPERATURE IN FAN SECTION CAN CAUSE MOTOR OVERHEAT AND DAMAGE ON DRAW THROUGH AIR HANDLERS ADJUST THE DISCHARGE AIR TEMPERATURE OF THE HEATING SE...

Страница 16: ...ling heating efficiency Dry cleaning is done by using a powerful vacuum cleaner on the dust accumulated side If coil is very dirty coils need to be removed for wet cleaning by trained personnel Ensure...

Страница 17: ...IR VELOCITY SHOULD NOT BE LOWER THAN 2 0 m s 7 7 Heat Wheel Heat Pipe The unit should be maintained in line with the manufacturer recommendation Please refer installation and maintenance manual for de...

Страница 18: ...not evenly supported on foundation j Fan assembly s tolerance is out of range a Consult manufacturer b Remove transport bracket c Check pulley alignment d Re tension belts e Replace vibration isolato...

Страница 19: ...he heat wheel baffle top 8 Assembled back the remaining panels 9 2 AHU Water Quality Water quality requirements Water softening treatment must be given in advance to prevent scaling in the heat exchan...

Страница 20: ...Yes No 5 Correct incoming voltage that supplied to motor L1 L2 __________ L2 L3 __________ L3 L1 __________ 6 Rotate fan wheel whether it can rotate freely and without abnormal noise Answer Yes No 7 A...

Страница 21: ...Are the AHU sections joined with section joint properly Answer Yes No 4 Are the joining between AHU sections sealed properly Answer Yes No Start Up Checking 1 Is fan rotated in correct direction Answe...