
8
|
Charging refrigerant
Installer reference guide
49
2(A)MXM40+50 + 2(A)MXF40+50
R32 Split series
4P600463-2C – 2020.08
Prerequisite:
Before charging refrigerant, make sure the refrigerant piping is
connected and checked (leak test and vacuum drying).
1
Connect the refrigerant cylinder to the service port.
2
Charge the additional refrigerant amount.
3
Open the gas stop valve.
8.7 To fix the fluorinated greenhouse gases label
1
Fill in the label as follows:
b
Contains fluorinated greenhouse gases
2
1
1
1
2
2
kg
tCO
2
eq
GWP × kg
1000
=
=
+
kg
=
kg
=
GWP: XXX
RXXX
a
f
c
d
e
a
If a multilingual fluorinated greenhouse gases label is delivered with the unit (see accessories), peel off the
applicable language and stick it on top of
a
.
b
Factory refrigerant charge: see unit name plate
c
Additional refrigerant amount charged
d
Total refrigerant charge
e
Quantity of fluorinated greenhouse gases
of the total refrigerant charge expressed as tonnes CO
2
equivalent.
f
GWP = Global warming potential
NOTICE
Applicable legislation on
fluorinated greenhouse gases
requires that the refrigerant
charge of the unit is indicated both in weight and CO
2
equivalent.
Formula to calculate the quantity in CO
2
equivalent tonnes:
GWP value of the
refrigerant × total refrigerant charge [in kg] / 1000
Use the GWP value mentioned on the refrigerant charge label.
2
Fix the label on the inside of the outdoor unit near the gas and liquid stop
valves.
Содержание 2MXM40M4V1B
Страница 75: ......
Страница 76: ...4P600463 2C 2020 08 Copyright 2019 Daikin Verantwortung f r Energie und Umwelt...