5-7
Chapter 5
W
elding Operation
C
HECK
AND
S
ETTING
OF
W
ELDING
C
ONDITION
W
ELDING
O
PERATION
C
HAPTER
5
5.5 Check and Setting of Welding Condition
This section explains how to check the welding condition as well as how to prevent erroneous operation
on the operation panel (Erroneous operation prevention function).
5.5.1 Reading welding condition
Before starting the welding operation, it is necessary to set the welding conditions (such as welding
current/voltage, type of shielding gas, and wire type/wire diameter). (
When the welding conditions are registered to memory, it can be read out. (
Welding Conditions)
When the condition is read, confirm that the welding conditions are correct.
5.5.2 Preventing erroneous operation on operation panel
This section explains how to prevent erroneous operation on the operation panel.
To prevent accidental change of the welding conditions, the erroneous operation prevention function is
equipped for the operations other than inching, gas check, or reading/saving of the welding condition.
In using the analog remote control, however, the adjustment of current/voltage by the analog remote
control is available.
The erroneous operation prevention function does not need any password to release the lock. To allow
only selected personnel to change the welding conditions, use the protection function of the welding
conditions which requires a password. (
-
Protection of Welding Conditions)
5.5.2.1
Activating erroneous operation prevention function
1.
Press and hold the ENTER key for approximately three seconds or more.
⇒
When the erroneous operation prevention function is activated, the LED of the ENTER key flashes.
5.5.2.2
Deactivating erroneous operation prevention function
1.
Press and hold the ENTER key for approximately three seconds or more again.
⇒
The LED of the ENTER key lights off, which deactivates the erroneous operation prevention function.
ENTER
㧔
3 sec.
㧕
ENTER key
Welding power
source
Содержание OTC Welbee WB-P320E
Страница 2: ......
Страница 8: ...TABLE OF CONTENTS vi MEMO ...
Страница 28: ...PART NAMES PRODUCT SPECIFICATION AND CONFIGURATION CHAPTER 2 2 12 ...
Страница 52: ...WIRING OF VOLTAGE DETECTION CABLE AT BASE METAL SIDE CONNECTION CHAPTER 4 4 18 ...
Страница 140: ...TROUBLESHOOTING TROUBLESHOOTING CHAPTER 9 9 6 ...