![Dahua ITC114-PH1B Скачать руководство пользователя страница 10](http://html.mh-extra.com/html/dahua/itc114-ph1b/itc114-ph1b_user-manual_500043010.webp)
7
3 Installation
Note:
The installation surface must be able to bear at least 3X of total weight of bracket and
detector.
Step 1. At device installation position, use electric drill to dig one hole with diameter of 35mm on
the bridge
Note:
Screw hole diameter is 33mm.
Figure 3- 1
Step 2. At the position in above figure, pull cable of vehicle parking detector through hole on the
bridge.
Figure 3- 2
Step 3. Take out screw on accessories bag, according to the figure, pull cable through screw,
fixed on bridge.