User’s Manual
4
Installation and Configuration
3.3.1 Preparations before You Begin
Table 3-2
Tool requirements
Name
Image
Name
Image
Phillips and
slotted
screwdrivers
M10×100
expansion screw ×
4
Marker × 1
Open-end
wrenches
Cutting
Machine × 1
Hammer × 1
Fine sand
Scuff-plate
Power drill × 1
Configuration
cable × 1
Site survey: Equipment installation must be at least 2 meters away from large electrical
appliances, escalators, metal panels, etc.
After determining the installation location, use a marker to draw lines, punch holes, and cut
grooves. Then clean up the site.
Содержание DHI-ISC-EAA6000-P
Страница 28: ......