
37
2) Steam heating
1
The heater operates until the target water temperature is reached.
2
Steam heating temperature setting
Course
Temperature setting
Time setting
Power saving
70
û
C
15 min
Standard
75
û
C
15 min
Strong
90
û
C
20 min
3
When the target temperature is reached, the time set for steam heating is reduced.
3) Steam washing
1
The water temperature is maintained and the steam effect is maximized in this operation.
2
Steam washing time
3
The reserved washing v/v operates for three seconds every three minute to flow the water to the door glass.
4) Finishing steam water supply
1
Steam washing is completed and it is advanced to the main washing) For this purpose, the same water level as the
general standard is achieved.
2
The time set for water supply is one minute.
5) Finishing steam washing
1
It is required when you failed to reach the target temperature in the main washing.
2
The time set for water supply is 25 minutes.
6) Main washing
1
Same as the general standard washing.
Course
Temperature setting
Time setting
Power saving
7 min
70
û
C/75
û
C
Standard
10 min
75
û
C/80
û
C
Strong
15 min
90
û
C/95
û
C
Strong
25 min
90
û
C/95
û
C
Содержание KUD-UD122RF
Страница 10: ...4 Parts list by ass y 8 1 PANEL F AS 1 UD123X SERIES...
Страница 12: ...10 1 PANEL F AS 2 UD124X SERIES...
Страница 16: ...14 3 CABINET F ASSY C11 C10 C07 C12 C03 C06 C09 C08 C05 C04 C01 C16 C02 C13 C14 C15...
Страница 18: ...16 4 CABINET ASSY...
Страница 20: ...18 5 BASE U AS...
Страница 22: ...20 6 TUB ASSY...
Страница 24: ...22 7 DUCT B AS DUCT PIPE AS...
Страница 78: ...76 1 Structure of BLDC Motor 7 HEATER BLDC MOTOR 2 Power Transmission System of BLDC Motor...
Страница 80: ...78 8 WIRING DIAGRAM...