13
• LOCATION OF INSTALLATION
1. Install the unit at a place having sufficient strength to support the unit securely.
2. Do not install the unit at a place where leakage of combustible gas is suspected.
3. If the air conditioner is operated in an atmosphere containing oils (including machine oil), salt near a
coastal area, etc, such substances may lead to failure of the unit.
4. Provide sufficient clearance or space around the air inlet and air outlet so that air flow will not be
obstructed (See following figures).
• BEFORE INSTALLATION
Test Run Unit : Plug unit into proper power supply outlet.
Refer to operating instructions in this manual for comfortable living. Check all controls for correct
operation, then unplug unit.
Determine Correct Mounting procedure-Refer to Window Installation or Through the Wall Installation.
INSTALLATION INSTRUCTIONS
WARNING :
• Moving parts can cause personal injury. Be careful when test-running unit. Do not operate
unit with front grille removed .
• Be sure to use an exclusive line
• Contact service man when replace the power cord set.
;;
;;
;;
;;;;
;;;;
;
;
;
;
;
;;
;;
;;
;;
;;
minimum
1m
minimum
60cm
OUTLET
INLET
Wall or
Fence
North or East
45˚
45˚
45˚
Indoor
Indoor
;;
;;
;;
;;
minimum
30cm
minimum
30cm
maximum
25cm
maximum
25cm
Indoor
Outdoor
;;
;;
;;
;;
Indoor
Outdoor
Outdoor
Outdoor
minimum
minimum
minimum
CAUTION
1. Install the exclusive main power switch (main circuit breaker) and auxiliary power switch.
(a leakage circuit breaker)
2. Be sure to earth the exclusive power source line.
3. Power source is 220V.
4. Consumer must pay the charge of wiring and installation.